
Your plan, drawn properly
Custom floor plans
Layouts developed from your sketch or brief, checked against zoning and the code, and drawn for permit.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes · Burlington, Halton Region
Custom homes in Burlington, designed and permitted by one office: floor plans and elevations, structural and mechanical design, energy compliance and the grading plan. We fit the house to By-law 09-2026, Zoning By-law 2020 or NEC zoning, whichever governs the lot, email the full set to the City of Burlington Building Department and coordinate construction through to occupancy.

What’s included
A new house is the one project where every discipline is ours from the start. The structural sheet never fights the mechanical one, and the office that drew both coordinates the build. In Burlington the package goes to the City of Burlington Building Department, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from the lot to the occupancy permit, with one office answering for every drawing.
We walk the lot, check the zoning and any conservation or servicing constraints, and turn your brief or sketch into a first layout.
Architectural, structural and mechanical drawings developed together in one office, then filed for permit and followed through the city’s comments.
Excavation, foundation, framing, envelope, rough-ins and finishes by the builder we coordinate, with the engineer on site at each structural stage.
Final inspections, the occupancy permit, and a house built to the drawings you approved.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179A building permit with architectural, structural, mechanical and energy-compliance drawings and a grading and servicing plan, plus any minor variance or conservation permit the lot triggers. The City of Burlington Building Department issues the building permit and, at the end, the occupancy permit, and inspects the build in between. Burlington’s Site Alteration By-law 064-2014 can require a permit on a residential lot for a pool, regrading or infilling the yard, a patio or a retaining wall. A new house regrades its yard and may need a retaining wall at a walkout. We check both against the by-law and file any permit it needs beside the building permit.
If the lot is inside the regulated area of Conservation Halton, yes. Under Ontario’s Conservation Authorities Act, building a house or grading a site in hazardous lands, wetlands, river or stream valleys or shorelines at risk of flooding or erosion needs the authority’s permit, because O. Reg. 41/24 counts both as development. Beside a valley with stable slopes, the regulated area runs to the stable top of the bank plus 15 metres, which can decide where on the lot the house goes. The Conservation Halton permit comes first, then the Burlington building permit.
That depends on the rules of the Burlington Avenue-Ontario Street district. The first step is to check the lot against its boundary. Burlington’s Burlington Avenue-Ontario Street Heritage Conservation District was designated under Part V of the Ontario Heritage Act by By-law 08-2026, which City Council passed on March 2, 2026. Because the district is recent, a plan drawn before it was designated is checked against it again. For a lot inside it, we confirm with the City of Burlington Building Department what the district asks of a new house before the design is fixed.
Yes. We take on new custom homes across Burlington, including Aldershot and Downtown Burlington, within an hour of our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: lot address and a survey, if you have one; your sketch, brief or a plan from another designer; and whether the lot is serviced or needs a well and septic. Send those and we tell you what the City of Burlington Building Department will ask for before we quote.
We start from the by-law that zones the lot, which for most houses is the Residential Zoning By-law 09-2026 and elsewhere Zoning By-law 2020, and read its height, coverage and setback limits against your survey. Those limits give the outline the design has to fit, and where it needs slightly more room, a minor variance from Burlington’s Committee of Adjustment comes first, since the City of Burlington Building Department cannot issue the permit until it is granted.
They can. Demolition, the basement dig and the service trench all reach into the soil where roots are, and inside the Urban Planning Area Burlington’s Private Tree By-law, 040-2022 as amended by 100-2025, needs a permit before a private tree 20 cm or more in diameter at 1.37 m is injured, with heritage trees and species at risk protected too. Each of those trees, yours and the neighbours’ along the lot lines, goes on the survey before we place the footprint, and any tree permit is applied for while the City of Burlington Building Department reviews the set.
As an email to buildingpermits@burlington.ca, since Burlington has no online portal for building permit applications, carrying the architectural, structural, mechanical and energy sheets and the grading plan. Status is checked by phone, because the City’s myfiles tool only follows Pre-Building Approval files, and if one round of comments touches several disciplines, we revise those sheets together and send back one complete resubmission, so every sheet the City of Burlington Building Department holds matches.
Yes. Ontario’s Building Code Act bars demolishing a building without a permit, just as it bars building one, so we email the demolition application to buildingpermits@burlington.ca with the new house’s set, or ahead of it if the lot needs clearing first. Once the demolition permit is issued, the old house can come down while the City of Burlington Building Department is still reviewing the new one.
The Niagara Escarpment Commission does. Properties in the NEC’s area take their zoning from the NEC rather than from By-law 09-2026 or Zoning By-law 2020, so we confirm with the NEC what applies to your lot before the house is massed. The Private Tree By-law covers trees inside the Urban Planning Area Boundary only, so on an escarpment lot we also check which side of that line it falls on, and the building permit itself is still issued by the City of Burlington Building Department.
Yes, and it helps most before the design is fixed. Our director is broker of record at our sister company, Fine Homes Real Estate, and he compares the house you have in mind with what has recently sold around the lot, whether that is in Aldershot, Millcroft, Alton Village or Downtown Burlington. With the city’s housing mostly single-detached, those sales are usually detached houses too, and what they fetched can decide how large a house is worth building, alongside what the zoning permits.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationThe house sets it: its size, the finishes, the systems chosen and the site work the lot needs. Design and engineering are priced as separate lines from construction. Fine Engineering prices from drawings, so the quote comes after the free consultation, once there is a design to measure.
They can be. A builder repeating one plan across a subdivision can spread the design, engineering and approvals over many lots. A custom home carries those costs alone, and the owner’s choices of layout and structure add to them. Fine Engineering points out which design choices add cost as the first layout is drawn.
It depends on the lot and the house. Design and the permit come before construction, and once a complete application meets the Building Code’s criteria, the Code sets a statutory review period for a house permit. Fine Engineering gives a schedule with the quote and updates it as the municipality responds.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
In Burlington the reviewer is the City of Burlington Building Department. Every Burlington lot sets its own terms: zoning, servicing, soil and any conservation authority permit decide what the lot allows before a plan is drawn.
We walk the site with the survey on a scheduled visit before anything is drawn, then file the new custom homes package to the City of Burlington Building Department’s own checklist.
Burlington’s housing is mostly single-detached houses in an urban area that has grown south of Dundas Street since the 1950s, with only limited rural housing in the north. Inside the urban area, a custom home goes on a serviced lot and meets the grades around it. On the rural lots to the north, the well, the septic system and road access are settled before any floor plan.
Burlington’s residential by-law lets an urban lot zoned for detached, semi-detached or townhouse dwellings carry up to three additional units, of which as many as two may be detached, and a lot can have only one accessory building holding detached units. A new house is the easiest point to decide how many of those you want, because the foundation, the stair and the services are all still on paper.
On the drawings, that means a basement with enough headroom for a unit, a side entrance located before the grading is set, and a fire separation between floors built in from the start. For a backyard building with one or two units, we leave the rear yard clear of the house and size the water and sewer laterals for it, and the basement unit can be permitted with the house itself.
Burlington’s residential zones moved to a new by-law on March 2, 2026, when By-law 09-2026 took effect and Zoning By-law 2020 was repealed for those zones. A plan drawn to Zoning By-law 2020’s height, coverage and setback numbers before then may be built around rules that no longer apply to the lot.
If you bring us a plan from another designer, or one started before March 2026, we recheck every zoning figure on it against By-law 09-2026 before the structural and mechanical design is built around it. Lots outside the residential zones remain under Zoning By-law 2020, so for them the older numbers may still be the right ones.
Contact us
Send us the lot address and your sketch and we’ll tell you what it takes, on a free first call.
First consultation free(416) 990-9179