
Your plan, drawn properly
Custom floor plans
Layouts developed from your sketch or brief, checked against zoning and the code, and drawn for permit.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes · Newmarket, York Region
A new house in Newmarket from the same team that designs it: plans and elevations, structure, heating and energy compliance, then construction by our crew. We draw it to Comprehensive Zoning By-law 2010-40 or the Urban Centres by-law, whichever covers the lot, and file the set with the Town on its Development Portal.

What’s included
A new house is the one project where every discipline is ours from the start. The structural sheet never fights the mechanical one, and the office that drew both coordinates the build. In Newmarket the package goes to the Town of Newmarket Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from the lot to the occupancy permit, with one office answering for every drawing.
We walk the lot, check the zoning and any conservation or servicing constraints, and turn your brief or sketch into a first layout.
Architectural, structural and mechanical drawings developed together in one office, then filed for permit and followed through the city’s comments.
Excavation, foundation, framing, envelope, rough-ins and finishes by the builder we coordinate, with the engineer on site at each structural stage.
Final inspections, the occupancy permit, and a house built to the drawings you approved.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179A building permit with architectural, structural, mechanical and energy-compliance drawings and a grading and servicing plan, plus any minor variance or conservation permit the lot triggers. The Town of Newmarket Building Division issues the building permit and, at the end, the occupancy permit, and inspects the build in between. Newmarket has its own site alteration by-law, and we ask the Town of Newmarket Building Division early whether the earthworks around the new house need a permit under it.
If the lot is inside the regulated area of the Lake Simcoe Region Conservation Authority (LSRCA), yes. Under Ontario’s Conservation Authorities Act, building a house or grading a site in hazardous lands, wetlands, river or stream valleys or shorelines at risk of flooding or erosion needs the authority’s permit, because O. Reg. 41/24 counts both as development. The authority has to publish maps of its regulated areas and review them at least once a year. We check the lot against the current map. The LSRCA permit comes first, then the Newmarket building permit.
That depends on the rules of the Lower Main Street South district. The first step is to check the lot against its boundary. Newmarket has one Heritage Conservation District under Part V of the Ontario Heritage Act, the Lower Main Street South Heritage Conservation District. For a lot inside it, we confirm with the Town of Newmarket Building Division what the district asks of a new house before the design is fixed.
Yes. We take on new custom homes across Newmarket, including Historic Downtown and Glenway, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: lot address and a survey, if you have one; your sketch, brief or a plan from another designer; and whether the lot is serviced or needs a well and septic. Send those and we tell you what the Town of Newmarket Building Division will ask for before we quote.
They often decide how far the house can spread. Under Newmarket’s Private Tree Protection By-law 2022-10, destroying or injuring a private tree 20 cm or more in trunk diameter at 1.4 m needs a Private Tree Permit, and the demolition, the new foundation dig and the service trench can all do that kind of harm. Trees that fall under the Town’s Woodlot By-law or York Region’s Forest Conservation By-law are excepted from the permit, so the survey notes which rule governs each tree before the site plan reaches the Town of Newmarket Building Division.
We do. Ontario’s Building Code Act lets no one demolish a building until the chief building official has issued a permit, so the demolition application goes to the Town of Newmarket Building Division through its Development Portal alongside the new house. If the old house is one of the heritage homes around Main Street, we check its heritage status with the Town before that application is made.
Start with the zoning by-law that covers it: a lot in one of the Urban Centres follows By-law 2019-06 rather than 2010-40. Then check whether it sits inside the Lower Main Street South district and whether the LSRCA has mapped any part of it as regulated land. We can check all three before your offer is firm, and the answers show how large a house the lot can take and which approval comes first.
Yes, at the zoning stage. For a property in the Oak Ridges Moraine area, the Town asks owners to get zoning information from its Planning Department. How big the new house can be and where it sits depend on that answer, so we get it before drawing anything. After that the set is filed on the Development Portal, and the Town of Newmarket Building Division reviews it and inspects the build like any other new house.
Yes. The Town takes building permit applications through the Development Portal and lets applicants track them, so you can watch your file move through review at the Town of Newmarket Building Division. We answer the examiner’s comments and resubmit until the permit is issued, and the portal shows where the file stands in the meantime.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationThe house sets it: its size, the finishes, the systems chosen and the site work the lot needs. Design and engineering are priced as separate lines from construction. Fine Engineering prices from drawings, so the quote comes after the free consultation, once there is a design to measure.
They can be. A builder repeating one plan across a subdivision can spread the design, engineering and approvals over many lots. A custom home carries those costs alone, and the owner’s choices of layout and structure add to them. Fine Engineering points out which design choices add cost as the first layout is drawn.
It depends on the lot and the house. Design and the permit come before construction, and once a complete application meets the Building Code’s criteria, the Code sets a statutory review period for a house permit. Fine Engineering gives a schedule with the quote and updates it as the municipality responds.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
In Newmarket the reviewer is the Town of Newmarket Building Division. Every Newmarket lot sets its own terms: zoning, servicing, soil and any conservation authority permit decide what the lot allows before a plan is drawn.
We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the new custom homes package to the Town of Newmarket Building Division’s own checklist.
Newmarket has heritage homes around Main Street with 1970s to 2000s subdivisions beyond, plus infill on former golf-course lands. An infill lot on the former golf-course lands usually comes with its own approved grading and servicing plan, which we pull before a custom home is drawn. Beside the heritage homes, the height and setbacks of the houses that stay are where the design starts.
The height, setbacks and coverage of a new Newmarket house come from the zoning by-law on the lot: Comprehensive Zoning By-law 2010-40, the Town’s main by-law, or Urban Centres Zoning By-law 2019-06 in the Urban Centres. We settle which one applies before shaping the house, so the design does not have to be redone halfway.
Two Ontario rules sit on top. Since November 21, 2025, a by-law’s minimum setback on urban residential land is read as 90 per cent of the stated distance, and buildings may cover up to 45 per cent of a lot with additional units unless the by-law allows more.
By-law 2026-10 lets a new detached, semi-detached, link, row or townhouse home in Newmarket carry two additional units, and one of them can be a separate building in the yard. A basement unit needs ceiling height, a separate door and fire separation designed in, and a garden suite needs space behind the house and a path for its pipes and wires, all simpler now than as a retrofit.
The water and sewer connections and the heating are sized with those units counted, even if they are added after you move in, and no unit is placed in the Environmental Protection Open Space zone or LSRCA floodplain, where the by-law does not allow one.
Contact us
Send us the lot address and your sketch and we’ll tell you what it takes, on a free first call.
First consultation free(416) 990-9179