New Custom Homes · Newmarket, York Region

New Custom Homes in Newmarket

A new house in Newmarket from the same team that designs it: plans and elevations, structure, heating and energy compliance, then construction by our crew. We draw it to Comprehensive Zoning By-law 2010-40 or the Urban Centres by-law, whichever covers the lot, and file the set with the Town on its Development Portal.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
New two-storey custom home with a standing-seam roof
Recent project
Haldimand County · 1,750 sq ft
Municipality
Newmarket, York Region
Permit office
Town of Newmarket Building Division
From our office
About 30 minutes
Fig. 01 · New two-storey custom home with a standing-seam roofRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

A new house is the one project where every discipline is ours from the start. The structural sheet never fights the mechanical one, and the office that drew both coordinates the build. In Newmarket the package goes to the Town of Newmarket Building Division, and it is drawn to that department’s checklist.

  • Custom home with a brick and board front

    Your plan, drawn properly

    Custom floor plans

    Layouts developed from your sketch or brief, checked against zoning and the code, and drawn for permit.

    • Floor plans & elevations
    • Zoning & lot fit
    • Sections & details
    • 3D views where they help a decision
  • Wood-frame houses under construction with a crane

    Stamped in-house

    Structural design

    Foundations, framing and roof designed by our P.Eng for the house, the soil and the site.

    • Foundation design
    • Wood framing & engineered lumber
    • Steel beams where spans need them
    • Site review during construction
  • Spiral ductwork across a ceiling

    Sized for the house

    HVAC & energy calculations

    Heat-loss and heat-gain calculations, equipment sizing, ductwork and the energy efficiency design the permit requires.

    • Heat-loss & gain calculations
    • Equipment & duct design
    • SB-12 energy compliance
    • Plumbing & electrical layouts
  • New custom home in Haldimand County

    One point of contact

    Build coordination

    Construction coordinated with the builder, and the engineer who drew the house on site through the build.

    • Scheduling & trades
    • Inspections at each stage
    • Changes decided on site
    • Occupancy & close-out

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

05 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Zoning & lot reviewVariances or conservation permits flagged
  2. Architectural drawingsPlans, elevations, sections, details
  3. Structural designStamped by our P.Eng
  4. Mechanical designHVAC with energy calcs, plumbing, electrical
  5. Grading & servicingSite drawings for the city
  6. Building permitFiled and followed to issue
  7. ConstructionCoordinated with the builder

How it runs

Process: 4 steps from first call to sign-off.

Four steps from the lot to the occupancy permit, with one office answering for every drawing.

  1. Lot & brief

    We walk the lot, check the zoning and any conservation or servicing constraints, and turn your brief or sketch into a first layout.

  2. Design & engineering

    Architectural, structural and mechanical drawings developed together in one office, then filed for permit and followed through the city’s comments.

  3. Build

    Excavation, foundation, framing, envelope, rough-ins and finishes by the builder we coordinate, with the engineer on site at each structural stage.

  4. Occupancy

    Final inspections, the occupancy permit, and a house built to the drawings you approved.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Lot address and a survey, if you have one
  • Your sketch, brief or a plan from another designer
  • Whether the lot is serviced or needs a well and septic
  • A rough budget range and a target move-in
  • Any previous permits, conservation letters or soil reports

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

  • Halton

  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: new custom homes in Newmarket, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • A building permit with architectural, structural, mechanical and energy-compliance drawings and a grading and servicing plan, plus any minor variance or conservation permit the lot triggers. The Town of Newmarket Building Division issues the building permit and, at the end, the occupancy permit, and inspects the build in between. Newmarket has its own site alteration by-law, and we ask the Town of Newmarket Building Division early whether the earthworks around the new house need a permit under it.

  • If the lot is inside the regulated area of the Lake Simcoe Region Conservation Authority (LSRCA), yes. Under Ontario’s Conservation Authorities Act, building a house or grading a site in hazardous lands, wetlands, river or stream valleys or shorelines at risk of flooding or erosion needs the authority’s permit, because O. Reg. 41/24 counts both as development. The authority has to publish maps of its regulated areas and review them at least once a year. We check the lot against the current map. The LSRCA permit comes first, then the Newmarket building permit.

  • That depends on the rules of the Lower Main Street South district. The first step is to check the lot against its boundary. Newmarket has one Heritage Conservation District under Part V of the Ontario Heritage Act, the Lower Main Street South Heritage Conservation District. For a lot inside it, we confirm with the Town of Newmarket Building Division what the district asks of a new house before the design is fixed.

  • Yes. We take on new custom homes across Newmarket, including Historic Downtown and Glenway, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.

  • Three things to start: lot address and a survey, if you have one; your sketch, brief or a plan from another designer; and whether the lot is serviced or needs a well and septic. Send those and we tell you what the Town of Newmarket Building Division will ask for before we quote.

  • They often decide how far the house can spread. Under Newmarket’s Private Tree Protection By-law 2022-10, destroying or injuring a private tree 20 cm or more in trunk diameter at 1.4 m needs a Private Tree Permit, and the demolition, the new foundation dig and the service trench can all do that kind of harm. Trees that fall under the Town’s Woodlot By-law or York Region’s Forest Conservation By-law are excepted from the permit, so the survey notes which rule governs each tree before the site plan reaches the Town of Newmarket Building Division.

  • We do. Ontario’s Building Code Act lets no one demolish a building until the chief building official has issued a permit, so the demolition application goes to the Town of Newmarket Building Division through its Development Portal alongside the new house. If the old house is one of the heritage homes around Main Street, we check its heritage status with the Town before that application is made.

  • Start with the zoning by-law that covers it: a lot in one of the Urban Centres follows By-law 2019-06 rather than 2010-40. Then check whether it sits inside the Lower Main Street South district and whether the LSRCA has mapped any part of it as regulated land. We can check all three before your offer is firm, and the answers show how large a house the lot can take and which approval comes first.

  • Yes, at the zoning stage. For a property in the Oak Ridges Moraine area, the Town asks owners to get zoning information from its Planning Department. How big the new house can be and where it sits depend on that answer, so we get it before drawing anything. After that the set is filed on the Development Portal, and the Town of Newmarket Building Division reviews it and inspects the build like any other new house.

  • Yes. The Town takes building permit applications through the Development Portal and lets applicants track them, so you can watch your file move through review at the Town of Newmarket Building Division. We answer the examiner’s comments and resubmit until the permit is issued, and the portal shows where the file stands in the meantime.

Searched & answered

People Also Ask: what Newmarket searches about new custom homes.

Short answers to the new custom homes questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • The house sets it: its size, the finishes, the systems chosen and the site work the lot needs. Design and engineering are priced as separate lines from construction. Fine Engineering prices from drawings, so the quote comes after the free consultation, once there is a design to measure.

  • They can be. A builder repeating one plan across a subdivision can spread the design, engineering and approvals over many lots. A custom home carries those costs alone, and the owner’s choices of layout and structure add to them. Fine Engineering points out which design choices add cost as the first layout is drawn.

  • It depends on the lot and the house. Design and the permit come before construction, and once a complete application meets the Building Code’s criteria, the Code sets a statutory review period for a house permit. Fine Engineering gives a schedule with the quote and updates it as the municipality responds.

  • Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.

  • Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.

Good to know

Custom home permits and approvals in Newmarket

In Newmarket the reviewer is the Town of Newmarket Building Division. Every Newmarket lot sets its own terms: zoning, servicing, soil and any conservation authority permit decide what the lot allows before a plan is drawn.

We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the new custom homes package to the Town of Newmarket Building Division’s own checklist.

Custom homes around Main Street, Newmarket

Newmarket has heritage homes around Main Street with 1970s to 2000s subdivisions beyond, plus infill on former golf-course lands. An infill lot on the former golf-course lands usually comes with its own approved grading and servicing plan, which we pull before a custom home is drawn. Beside the heritage homes, the height and setbacks of the houses that stay are where the design starts.

Designing a new house to By-law 2010-40 or 2019-06

The height, setbacks and coverage of a new Newmarket house come from the zoning by-law on the lot: Comprehensive Zoning By-law 2010-40, the Town’s main by-law, or Urban Centres Zoning By-law 2019-06 in the Urban Centres. We settle which one applies before shaping the house, so the design does not have to be redone halfway.

Two Ontario rules sit on top. Since November 21, 2025, a by-law’s minimum setback on urban residential land is read as 90 per cent of the stated distance, and buildings may cover up to 45 per cent of a lot with additional units unless the by-law allows more.

Units a new Newmarket house can be built with

By-law 2026-10 lets a new detached, semi-detached, link, row or townhouse home in Newmarket carry two additional units, and one of them can be a separate building in the yard. A basement unit needs ceiling height, a separate door and fire separation designed in, and a garden suite needs space behind the house and a path for its pipes and wires, all simpler now than as a retrofit.

The water and sewer connections and the heating are sized with those units counted, even if they are added after you move in, and no unit is placed in the Environmental Protection Open Space zone or LSRCA floodplain, where the by-law does not allow one.

Contact us

Lot walked. House drawn. Built to the drawings we made.

Send us the lot address and your sketch and we’ll tell you what it takes, on a free first call.

First consultation free(416) 990-9179