
Your plan, drawn properly
Custom floor plans
Layouts developed from your sketch or brief, checked against zoning and the code, and drawn for permit.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes · Guelph
Custom homes in Guelph, from the zoning envelope to occupancy: infill between century homes near downtown or a new house on a south-end lot. Our P.Eng and BCIN team designs the house to Zoning By-law (2023)-20790, prepares the structural, mechanical and energy sheets, files them through GPAS and builds it.

What’s included
A new house is the one project where every discipline is ours from the start. The structural sheet never fights the mechanical one, and the office that drew both coordinates the build. In Guelph the package goes to the City of Guelph Building Services, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from the lot to the occupancy permit, with one office answering for every drawing.
We walk the lot, check the zoning and any conservation or servicing constraints, and turn your brief or sketch into a first layout.
Architectural, structural and mechanical drawings developed together in one office, then filed for permit and followed through the city’s comments.
Excavation, foundation, framing, envelope, rough-ins and finishes by the builder we coordinate, with the engineer on site at each structural stage.
Final inspections, the occupancy permit, and a house built to the drawings you approved.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179A building permit with architectural, structural, mechanical and energy-compliance drawings and a grading and servicing plan, plus any minor variance or conservation permit the lot triggers. The City of Guelph Building Services issues the building permit and, at the end, the occupancy permit, and inspects the build in between. Guelph has its own site alteration by-law, and we ask the City of Guelph Building Services early whether the earthworks around the new house need a permit under it.
If the lot is inside the regulated area of the Grand River Conservation Authority (GRCA), yes. Under Ontario’s Conservation Authorities Act, building a house or grading a site in hazardous lands, wetlands, river or stream valleys or shorelines at risk of flooding or erosion needs the authority’s permit, because O. Reg. 41/24 counts both as development. Development within 30 metres of a wetland is caught as well, which can push a house back from a low corner of the lot. The GRCA permit comes first, then the Guelph building permit.
It depends on the district. The first check is whether your lot is inside one. Guelph has heritage conservation districts for Brooklyn and College Hill, Downtown Guelph and the Ontario Reformatory, and on September 21, 2026 the City gave notice that Council had passed the designation by-law for a fourth district, the Ward. The Ward’s by-law is the most recent of these, and for a lot there we check its status when the design starts. For a lot inside a district, we confirm with the City of Guelph Building Services what it asks of a new house before the massing is drawn.
Yes. We take on new custom homes across Guelph, including Exhibition Park and Old University, within ninety minutes of our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: lot address and a survey, if you have one; your sketch, brief or a plan from another designer; and whether the lot is serviced or needs a well and septic. Send those and we tell you what the City of Guelph Building Services will ask for before we quote.
The height, lot coverage and setback figures for your zone, measured on the survey, mark out the space the house has to fit inside. They come from Zoning By-law (2023)-20790, except where a provision is still under city-wide appeal and the City points to Zoning By-law (1995)-14864, so we confirm the source of each limit before the first sketch. If the design you want sits just outside those limits, a minor variance from the Committee of Adjustment comes before the permit application goes into GPAS.
We do. The full set goes to the City of Guelph Building Services through GPAS, the examiners’ comments come back the same way, and we answer them all in one resubmission so every sheet stays in step. The same system lets you check the permit’s status, and it is where we book the inspections once building starts.
It can. On a rebuild, the demolition, the basement dig and the service trench can all reach roots, and By-law (2025)-21059 needs a permit before a regulated tree is injured: 30 cm or more in diameter at 1.4 metres on any lot, or 10 cm or more on a lot over 0.2 hectares, a much lower bar. We plot those trees, and the neighbours’ near the lot lines, before the footprint is placed and the set goes to the City of Guelph Building Services.
Yes. In a zone that permits additional dwelling units, a new single-detached house can be planned for up to three of them, inside the house or in a detached building in the rear or interior side yard, which can hold two. We size the water and sewer connections, the basement headroom and the separate entrances in the first set, so the City of Guelph Building Services reviews the units with the house rather than as a later job.
We do. Ontario’s Building Code Act needs a permit to demolish a building just as it does to build one, so the demolition application goes into GPAS with the new house. If the lot is inside one of Guelph’s heritage conservation districts, we raise the demolition with the City before anything is filed.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationThe house sets it: its size, the finishes, the systems chosen and the site work the lot needs. Design and engineering are priced as separate lines from construction. Fine Engineering prices from drawings, so the quote comes after the free consultation, once there is a design to measure.
They can be. A builder repeating one plan across a subdivision can spread the design, engineering and approvals over many lots. A custom home carries those costs alone, and the owner’s choices of layout and structure add to them. Fine Engineering points out which design choices add cost as the first layout is drawn.
It depends on the lot and the house. Design and the permit come before construction, and once a complete application meets the Building Code’s criteria, the Code sets a statutory review period for a house permit. Fine Engineering gives a schedule with the quote and updates it as the municipality responds.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
In Guelph the reviewer is the City of Guelph Building Services. Every Guelph lot sets its own terms: zoning, servicing, soil and any conservation authority permit decide what the lot allows before a plan is drawn.
We walk the site with the survey on a scheduled visit, and combine it with the measure-up where we can, before anything is drawn, then file the new custom homes package to the City of Guelph Building Services’s own checklist.
Guelph has century brick and stone homes around downtown and Exhibition Park with newer subdivisions in the south end. Beside those older homes, a new house goes between neighbours that are staying, and their height and setbacks go on the first sketch. In the south end, a lot is usually covered by a subdivision grading plan, and a new house ties into it at its lot lines.
Before the house is placed, a surveyor’s elevations tell us how the lot drains now. The grading plan then fixes the top of the foundation, the garage floor and the driveway slope so water runs away from the house and out to the street or a swale, not toward a neighbour.
Earthworks beyond the house itself can fall under Guelph’s site alteration by-law. Our drawing samples include a grading plan we prepared for an 11,700 sq ft Guelph site under that permit, regraded for drainage and a new driveway, and a new house lot gets the same kind of sheet in its GPAS set.
A new house heated through the winter has two energy routes under the 2024 Building Code: beat the 2012 Code’s efficiency levels by at least 15 per cent, or follow Chapters 1 and 3 of Supplementary Standard SB-12. We choose one with you while the walls, windows and heating are still open, because the choice changes all three.
The energy summary goes into the GPAS set with the heat loss and duct design, and the City of Guelph Building Services checks the house against the route it names.
Contact us
Send us the lot address and your sketch and we’ll tell you what it takes, on a free first call.
First consultation free(416) 990-9179