
The way in
Separate entrance
A new exterior door cut into the foundation, with the stairwell, guard and drainage designed so the opening does not weaken the wall.
- Foundation opening design
- Stairwell & drainage
- Guards & lighting
- Frost & waterproofing
Legal Basements · Richmond Hill, York Region
Legal basement apartments in Richmond Hill, from the first measurement to the final inspection: separate entrances, fire separations, egress windows, the second kitchen and the heating for two units. We draw and stamp the set in our Yonge Street office, check it against By-law 143-24 and file it with the City of Richmond Hill Building Division.

What’s included
A legal unit is a list of code items, and the inspector checks each one. We design to that list, build to it, and book the inspections in the order the city wants them. In Richmond Hill the package goes to the City of Richmond Hill Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
06 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from a bare basement to a closed permit, with the inspections built into the schedule.
We measure the ceiling, look at the windows, the entrance options and the mechanical room, and tell you whether the basement can be made legal and what it will take.
Layout, separations, the structural opening and HVAC are drawn in one office and filed with the municipality. City comments are answered at no extra charge.
Entrance, framing, rough-ins, insulation and rated assemblies go in, inspected at each stage.
Kitchen, bathroom, flooring and doors, then the final inspection and the closed permit.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179A building permit for the unit, applied for with drawings at Richmond Hill’s own building department rather than York Region. The stairwell for a new entrance changes the grade beside the house, and Richmond Hill’s site alteration by-law covers residential regrading, so where the dig reshapes the yard, a grading plan by an engineer or surveyor goes with it. We prepare and file the set and deal with the examiner’s comments.
Only where the lot is inside Toronto and Region Conservation Authority (TRCA) regulation, near a watercourse, a valley or a floodplain. Digging a stairwell down to the basement changes the grade there, and the TRCA permit may be needed before Richmond Hill issues the building permit. Oak Ridges and Lake Wilcox in the north drain to Lake Simcoe and are under the Lake Simcoe Region Conservation Authority. For a lot there, we read that authority’s mapping instead, before the entrance is drawn.
Richmond Hill permits up to three additional residential units on a lot in addition to the primary dwelling, as long as the lot has no more than four dwelling units in total and no more than two of the additional units are in an accessory residential building, such as above a detached garage. ARUs are subject to zoning requirements and restrictions, including a building permit, and the lot must be separately serviced by municipal sewage works and drinking water. That can leave room for more than one extra unit, so we plan the basement layout with any later unit in mind before anything is filed.
Yes. We take on legal basements across Richmond Hill, including Oak Ridges and Mill Pond, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address; basement ceiling height, measured floor to joist; and photos of the basement, the mechanical room and the outside wall where an entrance could go. Send those and we tell you what the City of Richmond Hill Building Division will ask for before we quote.
It may. Ontario’s O. Reg. 299/19 calls for one space for each additional unit, and a tandem space behind yours counts, unless the zoning by-law requires no space for the house or none for the unit. We read the parking rules in whichever by-law governs your address, CZBL 93-25 or the earlier one, alongside By-law 143-24 before the driveway and the entrance are drawn.
Not under By-law 143-24, which allows additional units only on a lot served by municipal sewers and drinking water. We confirm how your lot is serviced at the first visit, before anything is drawn, and where it is on municipal services the unit goes to the City of Richmond Hill Building Division for its permit.
The unit itself follows By-law 143-24 and the building permit, as it would anywhere in Richmond Hill. The Gormley Heritage Conservation District is more likely to bear on the outside work. It covers Gormley’s village core under the Ontario Heritage Act, so a new side door, a stairwell or a bigger basement window on a house there is something we take to the City before the entrance is drawn.
We tell you when the City of Richmond Hill Building Division issues it, and you can check for yourself on the Richmond Hill Permit Portal: once you log in, the application’s drawings and attachments sit under My Work, then My Permits/Plans/Licensing. An issued permit does not make the unit legal yet. That comes when its inspections pass and the permit is closed, and we book each inspection as the work reaches it.
It could. A stairwell dug beside the house cuts roots, and Richmond Hill’s Tree Preservation By-law 19-25 needs a permit before a private tree 15 cm or more in diameter, measured 1.4 m up the trunk, is injured as well as removed. We mark those trees on the survey and put the entrance on a side clear of them, or get the tree permit before the drawings reach the City of Richmond Hill Building Division.
Searched & answered
Short answers to the legal basements questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA legal basement is a basement apartment that meets the Building Code and the local zoning: a self-contained second unit with its own kitchen and bathroom. The code calls it a secondary suite, and Ontario’s planning rules call it an additional residential unit. Fine Engineering designs and permits these units across the GTA and coordinates the build.
At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
For many homeowners, yes. A legal second unit can earn rent and add property value, and because it was built under a permit, it avoids the trouble an unpermitted suite causes when the house is sold. The return depends on how much the basement needs, whether that is more headroom, a new exit or fire separation. Fine Engineering prices that work before any drawing starts.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Good to know
In Richmond Hill the reviewer is the City of Richmond Hill Building Division. Every Richmond Hill lot sets its own terms: the spare capacity in the electrical panel and the size of the water service the two units will share decide how much work a basement unit needs.
We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the legal basements package to the City of Richmond Hill Building Division’s own checklist.
Richmond Hill’s housing runs to single-detached subdivisions from the 1980s to 2000s, with older village lots near Mill Pond seeing custom rebuilds. On a lot being rebuilt, a basement unit is easiest planned before the foundation goes in, with ceiling height and drain depth set on the drawings. In an existing house in Bayview Hill or Lake Wilcox, floor-to-joist height decides whether underpinning is needed.
Richmond Hill is between zoning by-laws. Council passed CZBL 93-25 in 2025 and the Ontario Land Tribunal approved only part of it in 2026, so some areas are still under appeal and a lot outside the new by-law keeps the zoning it had before.
For a basement apartment, that by-law can decide where an outside entrance may go and how close a stairwell can come to the lot line. We confirm which one governs your address before the plan is fixed.
By-law 143-24 counts every unit on the lot: the main house plus up to three additional units, four in all, with no more than two of them in an accessory building such as the space over a detached garage. A basement apartment takes one of those three places.
Before it is drawn, we look at where a garden suite or another unit could go later. The basement entrance and walkway stay out of the side yard a suite would need for access, and the water and sewer connection is sized with the later units in mind.
Contact us
Send us the ceiling height and a few photos and we’ll tell you whether the basement can be made legal, on a free first call.
First consultation free(416) 990-9179