
Your plan, drawn properly
Custom floor plans
Layouts developed from your sketch or brief, checked against zoning and the code, and drawn for permit.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes · Brampton, Peel Region
Custom home builder for Brampton lots, from your sketch to occupancy: knockdown rebuilds on Bramalea’s planned 1960s to 1980s streets, and new homes laid out from the start for the units Brampton allows. We design to the stricter of the two zoning by-laws in force, file through the Brampton Building and Business Portal and build.

What’s included
A new house is the one project where every discipline is ours from the start. The structural sheet never fights the mechanical one, and the office that drew both coordinates the build. In Brampton the package goes to the City of Brampton Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from the lot to the occupancy permit, with one office answering for every drawing.
We walk the lot, check the zoning and any conservation or servicing constraints, and turn your brief or sketch into a first layout.
Architectural, structural and mechanical drawings developed together in one office, then filed for permit and followed through the city’s comments.
Excavation, foundation, framing, envelope, rough-ins and finishes by the builder we coordinate, with the engineer on site at each structural stage.
Final inspections, the occupancy permit, and a house built to the drawings you approved.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179A building permit with architectural, structural, mechanical and energy-compliance drawings and a grading and servicing plan, plus any minor variance or conservation permit the lot triggers. The City of Brampton Building Division issues the building permit and, at the end, the occupancy permit, and inspects the build in between. Brampton’s Site Alteration By-law 119-2024 exempts most minor residential landscaping. Because a new house moves far more earth than landscaping, we read the by-law against the grading plan before the application goes in.
If the lot is in a TRCA Regulated Area, yes. The west of the city drains to the Credit River and is under Credit Valley Conservation. We check which authority maps the lot before anything else. Building anything in a TRCA Regulated Area takes a TRCA permit, and Brampton will not issue the building permit until it is in hand. TRCA issues its permits in the owner’s name: the permit is yours, even though we prepare what it reviews. We confirm the issuing body when we apply, because TRCA is due to merge with the Central Lake Ontario Conservation Authority on February 1, 2027 or later.
That depends on the rules of the Churchville district. The first step is to check the lot against its boundary. The Churchville Heritage Conservation District, established in 1990, is Brampton’s only designated heritage conservation district. For a lot inside it, we confirm with the City of Brampton Building Division what the district asks of a new house before the design is fixed.
Yes. We take on new custom homes across Brampton, including Bramalea and Mount Pleasant, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: lot address and a survey, if you have one; your sketch, brief or a plan from another designer; and whether the lot is serviced or needs a well and septic. Send those and we tell you what the City of Brampton Building Division will ask for before we quote.
The zoning: height, setbacks and lot coverage, read from two by-laws at once while Zoning By-law 014-2026 is before the Ontario Land Tribunal. Zoning By-law 270-2004 still applies beside it, so for each limit the stricter figure is the one we design to. On a rebuild in Bramalea the house being replaced is a poor guide, since it was built decades ago under older rules, so we read both by-laws for your address before the plan starts.
It can. Demolition, the new foundation and the service trenches all work near roots, and Tree Preservation By-law 317-2012 needs a permit to injure a private tree as well as to remove it. Only trees under 30 cm across at 1.37 metres, or within 2 metres of an occupied building, fall outside it, so on a rebuild we plot every larger tree on the survey and check it against the new footprint and trenches before the set goes to the City of Brampton Building Division.
Yes. Under Ontario’s Building Code Act a demolition needs a permit just as new construction does, so the old house stays up until the City of Brampton Building Division has issued one for it. We prepare that application with the drawings for the new house and file both through the Brampton Building and Business Portal.
Yes, within Brampton’s limit of three units on the lot, the new house counted. You can plan it with one attached unit and a garden suite in the yard, or with two attached units and no suite, and placing them now settles the entrances, fire separations and service runs before anything is built. The whole layout still has to meet the stricter of the two zoning by-laws in force, which we check before the house is laid out.
Sometimes, if our P.Eng finds the footings and walls can carry the new design. The structure is not the only question, though: Ontario notes that a home built on existing footings or foundations may not be covered by the new-home warranties Tarion administers. On a Bramalea lot the old foundation was laid out in the 1960s to 1980s for the house now standing, so we weigh both points before the design is fixed and show the choice on the set for the City of Brampton Building Division.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationThe house sets it: its size, the finishes, the systems chosen and the site work the lot needs. Design and engineering are priced as separate lines from construction. Fine Engineering prices from drawings, so the quote comes after the free consultation, once there is a design to measure.
They can be. A builder repeating one plan across a subdivision can spread the design, engineering and approvals over many lots. A custom home carries those costs alone, and the owner’s choices of layout and structure add to them. Fine Engineering points out which design choices add cost as the first layout is drawn.
It depends on the lot and the house. Design and the permit come before construction, and once a complete application meets the Building Code’s criteria, the Code sets a statutory review period for a house permit. Fine Engineering gives a schedule with the quote and updates it as the municipality responds.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
In Brampton the reviewer is the City of Brampton Building Division. Every Brampton lot sets its own terms: zoning, servicing, soil and any conservation authority permit decide what the lot allows before a plan is drawn.
We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the new custom homes package to the City of Brampton Building Division’s own checklist.
Brampton’s housing is planned 1960s to 1980s communities like Bramalea alongside 2000s onward subdivisions in Mount Pleasant and Springdale. A subdivision lot there usually has an approved grading plan on file, which we pull before drawing so the custom home meets the grades and services the street already has.
The application for a new house is opened and paid for in the Brampton Building and Business Portal, where we upload the full drawing set for the City of Brampton Building Division. While it is under review, the city points applicants to Brampton Maps to follow its status, and we answer the examiner’s comments as they come.
Once the permit is issued, the portal shows each inspection the build goes through, from the footings to the final one before occupancy. Our crew calls them in as the work reaches each stage, so the permit closes when the house is done.
A new house must sit inside the minimum setbacks of its lot’s zoning, which in Brampton means the stricter of Zoning By-law 270-2004 and Zoning By-law 014-2026 for now. On urban residential land outside the Greenbelt and outside certain prescribed areas, Ontario has read each of those minimums at 90 per cent of the stated distance since November 21, 2025, which can widen a rebuild on a Bramalea lot.
Where the design includes added units, Ontario’s regulation lets the buildings cover up to 45 per cent of the lot unless the by-law allows more, and a garden suite has to stand at least 4 m from the house unless the zoning permits less. We place the house and any suite together on the site plan.
Contact us
Send us the lot address and your sketch and we’ll tell you what it takes, on a free first call.
First consultation free(416) 990-9179