Home additions in Richmond Hill, designed, permitted and built: rear, side and second-storey additions on 1980s to 2000s subdivision houses and on the older village lots near Mill Pond. Our P.Eng designs the foundation and the beams that join new rooms to the old house, and we check the lot against CZBL 93-25 or the earlier by-law before filing with the City of Richmond Hill Building Division.

What’s included
An addition is judged where it meets the old house: the beam that opens the wall, the roof that joins the existing one, the ducts that have to reach the new rooms. We design those joints first. In Richmond Hill the package goes to the City of Richmond Hill Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the slowest one, the tie-in to the house you are living in, planned around you.
We measure the house and lot, check what the by-law allows and look at the foundation and framing the addition will connect to.
Plans and elevations, structure, HVAC and electrical from one office, filed with the city and answered at no extra charge.
Excavation, foundation, framing and the opening into the existing house, then rough-ins, exterior and finishes, inspected at each stage.
Final inspection, permit closed, the house handed back as one building.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179The City of Richmond Hill Building Division handles the zoning check, the permit and the inspections; York Region looks after regional roads and servicing. Richmond Hill’s Site Alteration By-law 47-25 applies to pools and residential regrading, with a grading plan by an engineer or surveyor. An addition that changes the grades around the house can fall under it, and our P.Eng prepares the grading plan that application asks for.
If the lot is in a TRCA Regulated Area, yes: building anything there needs a TRCA permit, and Richmond Hill will not issue the building permit until you have it. TRCA also asks for a pre-submission consultation, which we book as soon as the survey shows a valley or creek near the house.
Yes, if it fits the zoning, and that is the first thing we check. Richmond Hill Council passed Comprehensive Zoning By-law 93-25 on September 24, 2025, and the Ontario Land Tribunal partly approved it on July 2, 2026. It is still under appeal for specific areas of the City, and properties it does not cover are still regulated by other applicable zoning by-laws. We confirm which by-law governs your lot and measure the addition against it. If it misses a setback or coverage limit by a little, a minor variance from the Committee of Adjustment can allow it, and the permit follows that decision.
It depends on whether your house is inside it. The City of Richmond Hill names the Gormley Heritage Conservation District as its first Heritage Conservation District under the Ontario Heritage Act. It came into effect on December 13, 2009 and covers the village core of Gormley. For a house inside the district, we ask Richmond Hill what it requires of an addition and design to that; outside it, the usual zoning and permit rules apply.
Yes. We take on home additions across Richmond Hill, including Oak Ridges and Mill Pond, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address and a survey, if you have one; what you want to add and where; and photos of the side of the house and the yard where it would go. Send those and we tell you what the City of Richmond Hill Building Division will ask for before we quote.
It can, because new footings cut roots. Under Richmond Hill’s Tree Preservation By-law 19-25, injuring a private tree 15 cm or more in diameter at 1.4 m above the ground needs a permit, just as removing it does. We put the surveyed trees on the site plan before the footprint is set, then keep the foundation clear of them or apply for the tree permit before the City of Richmond Hill Building Division gets the drawings.
Yes, if the lot qualifies. By-law 143-24 allows the house plus up to three additional units on a lot served by municipal water and sewer, and a unit can be built into an addition as well as a basement. It then needs its own entrance, fire separation and exit, and we design those into the addition from the start so the City of Richmond Hill Building Division reviews one complete set.
The zoning by-law that governs your lot answers that, CZBL 93-25 or, where it is under appeal or does not apply, the earlier by-law. Each defines lot coverage in its own words, so we read the one for your address and count the porch with the addition before either is sized. If the two together go over, the options are a smaller porch or a minor variance, and the City of Richmond Hill Building Division holds the permit until that is decided.
As high as the height limit in the by-law for your lot, CZBL 93-25 or the earlier by-law where the new one does not apply. That by-law also defines where height is measured from, so we work it out from the grades on your survey before the new walls and roof pitch are fixed, and the City of Richmond Hill Building Division checks the same measurement at zoning review.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationSize, storeys, how much of the existing house is opened and the finishes set it, so a figure given before there is a design means little. Foundation and structure are the fixed part and finishes the variable one, and a minor variance or a new heating system adds its own line. Fine Engineering itemizes the addition after the site visit.
It depends on what the addition adds: a bedroom, a bigger kitchen or a rental unit. The first two let the owner stay on a lot they already own, and a rental unit can also bring in income. Fine Engineering’s Director is a Broker of Record and can say what the new space may be worth at resale before the owner spends.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Stop work and start on the drawings. A stop-work order usually means construction began without a permit or departed from the approved plans. Getting out of it takes a permit application that shows what was built and what is proposed, then whatever inspections the city asks for. Fine Engineering prepares those drawings and replies to the city’s letters.
Good to know
In Richmond Hill the reviewer is the City of Richmond Hill Building Division. Every Richmond Hill lot sets its own terms: setbacks, lot coverage, what the existing foundation can carry and where the roof will join decide the addition before the first drawing.
We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the home additions package to the City of Richmond Hill Building Division’s own checklist.
Richmond Hill has single-detached subdivisions from the 1980s to 2000s, with older village lots near Mill Pond seeing custom rebuilds. On a subdivision house, a second storey or a rear addition starts from the original framing and the lot’s approved grades. On the older village lots, where custom rebuilds are going up, we compare what an addition and a rebuild would each involve.
An addition and a garden suite draw on the same backyard. By-law 143-24 gives a Richmond Hill lot room for up to three units beyond the house, but the zoning still caps how much of the lot buildings may cover, so a deep rear addition can use up the space a suite would need later. We lay out both on the survey before the addition is sized, so you decide with the trade-off in view.
Oak Ridges and Lake Wilcox drain to Lake Simcoe, so their conservation authority is the LSRCA, not the TRCA that covers most of Richmond Hill.
Section 28 of the Conservation Authorities Act requires the authority’s permit for building in a regulated valley, wetland, shoreline or flood-prone area, and Ontario Regulation 41/24 counts enlarging a building, and the grading for it, as development. On a regulated lot there, the LSRCA permit comes first and the City’s follows.
Contact us
Send us the address and what you want to add and we’ll tell you what fits, on a free first call.