Home Inspection

A home inspection read by an engineer.

Pre-purchase and pre-renovation inspections that look past the finishes at the structure, the mechanical systems and the code, so you know what you are buying, or what a renovation will really involve.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Front elevation of a two-storey brick house
Inspected by
Our engineering team
Drawn & stamped
In-house, one P.Eng and BCIN team
Service area
GTA, within 90 minutes of Richmond Hill
First consultation
Free, by phone or on site
Fig. 01 · Front elevation of a two-storey brick houseRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

The same team that designs structure, mechanical systems and permit drawings walks the house. That is what lets us say which wall carries load, whether the basement could be a legal unit, and whether the addition looks like it went through the city.

  • Stone-clad front entrance of a detached house

    Before you buy

    Pre-purchase inspections

    A walk through the house with an engineer’s eye before you waive conditions: foundation, framing, roof structure, mechanical systems and the signs of work done without a permit.

    • Foundation & structure
    • Roof & attic framing
    • Heating, plumbing & electrical overview
    • Signs of unpermitted work
  • Open stair inside a fully renovated home

    Before you plan

    Pre-renovation reviews

    What a renovation will actually involve: which walls carry load, where the ducts and drains can go, and whether the basement can become a legal unit.

    • Load-bearing wall identification
    • Basement ceiling height & egress check
    • Mechanical capacity review
    • The permit scope you can expect
  • Heritage brick house exterior

    When something looks wrong

    Structural assessments

    Cracks, sagging floors, bowing walls or a deck that moves: a P.Eng assessment of what is happening and what, if anything, needs to be done.

    • Crack & settlement assessment
    • Floor & beam deflection
    • Deck & porch structure
    • Written engineer’s report
  • Finished legal basement apartment in Vaughan

    Existing work

    Code compliance review

    A review of finished or in-progress work against the Ontario Building Code, for buyers, owners responding to a city order, or anyone who needs a professional opinion in writing.

    • Review of existing renovations
    • Second unit compliance check
    • Response to city orders
    • Engineer’s letters

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

06 common situations

What you get

06

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. On-site inspectionBy our engineering team
  2. Written reportPhotos, findings and priorities
  3. Structural notesFrom a P.Eng where the scope calls for it
  4. Permit notesFor the work you’re planning
  5. Follow-up callWe go through the findings with you
  6. Engineer’s letterFor a lender, an insurer or the city

How it runs

Process: 4 steps from first call to sign-off.

Four steps from booking to a report you can act on.

  1. Book & brief

    Tell us the address, the closing or condition date, and what worries you about the house. We fit pre-purchase inspections around your deadline where we can.

  2. On-site inspection

    We go through the structure, the attic and the basement, the mechanical room and the electrical panel, and note anything that looks like work done without a permit.

  3. Written report

    Findings, photos and priorities in plain language, with structural observations from our P.Eng where they apply and a note on what a renovation would need.

  4. Walk-through & next steps

    We go through the report with you on a call. If the answer is a repair, a permit or a design, the same team can carry on with it.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Property address and the date you need the report by
  • The listing, and any drawings or disclosures you have
  • What you are planning to do with the house
  • Specific concerns: cracks, water, a finished basement, an addition
  • Access arrangements with the seller or the agent

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

  • Halton

  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: home inspection, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • A standard home inspection is a visual check of the house’s condition. Ours is carried out by an engineering team that also designs structure, mechanical systems and permit drawings, so we can tell you whether a wall carries load, what the framing allows in a renovation and whether an addition looks like it went through the city. We do not replace a specialist inspection for pests, mould or buried tanks.

  • Our engineering team does, and the structural notes come from our P.Eng, who is licensed by Professional Engineers Ontario and BCIN-qualified in Small Buildings, Structural and HVAC. There is no provincial licence for home inspectors yet: the Home Inspection Act, 2017 would create one but has not come into force. So whoever you hire, ask which qualification they hold and who regulates it.

  • We try to. Tell us the date the condition expires when you book and we will say straight away whether we can fit the site visit and the report in.

  • We look for the signs of it: finishes that hide structure, a second unit without proper separation or egress, wiring or plumbing that does not match the age of the house, and additions with no drawings. We can also help you check the municipality’s permit records.

  • A pre-purchase inspection does not certify that, and the province’s own guidance says a home inspection is no test of code or zoning compliance. Ours flags work that looks non-compliant, such as a basement bedroom without an egress window or a beam that looks undersized for its span. When you need a firm answer on a specific piece of work, our code compliance review checks it against the Ontario Building Code and puts the result in writing.

  • Yes, as a pre-renovation review. We measure the ceiling against the Ontario Building Code’s 1.95 m for a second unit, look at where a separate entrance and egress could go, and check the fire separation and HVAC options. You find out whether the unit is realistic, and what the permit would involve, before the offer goes firm.

  • We can tell you what it would involve: the permits, the structural and mechanical work, and the limits the house sets. With a real estate broker on the team we can also speak to what it would do to the property’s value. Construction pricing comes from a defined scope, which we can prepare as a next step.

  • Where they need an engineer’s letter on a specific structural question, yes, our P.Eng can provide one. Ask when you book so we cover what they will look for.

Searched & answered

People Also Ask: what the GTA searches about home inspection.

Short answers to the home inspection questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • It depends on the house and on the scope you ask for. Size, age, a finished basement, an addition and poor attic access all lengthen the visit and the report, and a P.Eng structural assessment or an engineer’s letter adds to the work. Specialist testing is separate. Fine Engineering prices the scope once it knows the address, after a free first consultation.

  • Signs that the house is moving, taking on water or has been altered. That means cracks and settlement in the foundation, sagging floors and roof framing, stains in the attic and basement, the condition of the heating, plumbing and electrical, and finishes that hide structure or unpermitted work. At Fine Engineering the same visit includes an engineer’s view of what carries load.

  • It depends on the size and age of the house and on how much of it can be reached. Finished basements, blocked attic hatches and a crowded mechanical room take longer, and a structural assessment of a crack or a sagging floor adds time on site. Fine Engineering tells you how long to allow when you book, so the seller and the agent can plan access.

  • An on-site, visual examination of the house’s condition and structure: foundation, framing, roof structure and attic, basement, heating, plumbing, electrical and the exterior. Anything hidden behind finished walls is noted as a limit rather than opened up. With Fine Engineering it ends in a written report with photos and priorities, a note on the permits your plans would need and a call to go through it.

  • If the house has a finished basement, an addition, visible cracks or sloping floors, or you plan a major renovation, an engineer’s inspection tells you what a checklist cannot: whether the structure is sound, what was permitted and what the renovation would involve. Fine Engineering carries out pre-purchase inspections across the GTA.

  • Often, yes. The opening needs a beam sized for the load above, posts under each end and a path that carries the load down to the foundation. The Building Code’s span tables cover some simple cases, but once the beam falls outside them, a licensed P.Eng has to design and stamp it. Fine Engineering prepares the engineering and the permit drawings together.

Good to know

Home inspector licensing in Ontario

Ontario does not currently have mandatory requirements for home inspectors. The Home Inspection Act, 2017 would require people who perform home inspections to be licensed, apart from exemptions set by regulation, but it is not yet in force. Until it is, the qualification behind an inspection has to be checked person by person.

The province’s buyer guidance suggests asking an inspector about accreditation, references, insurance and a written contract, and notes that insurance is not currently required by law. Our structural notes come from a P.Eng licensed by Professional Engineers Ontario, a licence you can confirm on the PEO public register before you book.

A home inspection is not a building code inspection

A home inspection is not a pass or fail test, and it does not assess whether a home meets zoning or building codes. Ontario describes it as a visual inspection of a home’s major elements and systems, and the inspector gives no warranty on the home’s condition.

Two other checks deal with the code. Municipal building inspectors inspect construction done under a permit, at the stages the Building Code sets, once the permit holder calls for them. For finished work that never had a permit, such as a basement suite or an addition, our code compliance review checks it against the Ontario Building Code and sets out what a permit would need.

Pre-purchase inspection inside your conditional period

A pre-purchase inspection only helps while the offer is still conditional, so book it as soon as the condition date is agreed and give us that date. We plan the visit around the seller’s access and tell you at booking whether the report can be in your hands before the condition expires.

Bring whatever paperwork the house has: the listing, the seller’s disclosures, and drawings or permits for a finished basement or an addition. Gaps in that file show where to look hardest on site. If the seller cannot produce the permits, the municipality’s building department keeps permit records by address.

What sets the cost of a home inspection in the GTA

Mostly the house. A larger or older house, a finished basement, an addition or a second unit takes longer to inspect and to write up, and a crawlspace or attic with poor access adds time. Then the scope: a P.Eng assessment of a particular crack or floor, an engineer’s letter for a lender, or a review of the renovation you plan each add work.

Whatever the scope, every inspection ends with written findings, photos and priorities, and a call to go through them. We quote once we know the address and what you want covered, and the first consultation is free.

Contact us

Look closer. Buy informed. Renovate with a plan.

Tell us the address and your condition date, and we’ll tell you whether we can fit the inspection in, on a free first call.

First consultation free(416) 990-9179