Site Engineering & Land Development

Grading, drainage and site approvals, from the lot line in.

Grading plans, drainage design, site alteration permits, pool and landscape design and minor variance packages, prepared by a P.Eng so the water goes where the city wants it and the project clears review.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Freshly graded lot with a new concrete driveway rising to the house
Deliverable
Grading & site plans
Drawn & stamped
In-house, one P.Eng and BCIN team
Service area
GTA, within 90 minutes of Richmond Hill
First consultation
Free, by phone or on site
Fig. 01 · Freshly graded lot with a new concrete driveway rising to the houseRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

A site plan is reviewed by a different department from the building permit, against its own criteria. We design the lot to those criteria first, then take it through the reviewer who applies them.

  • Grading plan sheet for a site in Guelph

    Drainage & runoff

    Grading plan

    Existing and proposed elevations, swales and drainage patterns for a lot, with runoff calculations and sediment control, for building permits, pools and site alteration.

    • Lot grading & drainage design
    • Runoff analysis & calculations
    • Erosion & sediment control
    • Surface drainage details
  • Lakeside deck and walkout with landscaping

    Backyards

    Pool & landscape design

    Pool permits and the grading that goes with them, plus driveways, pergolas, porches and outdoor living areas designed to code.

    • Pool enclosure permits
    • Backyard & landscape layouts
    • Driveways & hard surfaces
    • Pergolas, porches & lounge areas
  • New concrete driveway curving up to a house at dusk

    Earthworks

    Site alteration permits

    Approvals for excavation, cut and fill, major landscape changes and the accessory structures that go with them, under the municipal site alteration by-law.

    • Excavation & cut-and-fill plans
    • Major landscape changes
    • Garages & accessory structures
    • Demolition & site removal
  • New custom home on its lot

    Committee of Adjustment

    Zoning plan approval

    Site layouts and development plans checked against the zoning by-law, with the minor variance drawings and the coordination with authorities a project needs when it asks for relief.

    • Site plans & development layouts
    • Zoning review & minor variances
    • Committee of Adjustment packages
    • Coordination with the city and the conservation authority

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Grading planElevations, swales and drainage
  2. Stormwater notesRunoff calculations for the city
  3. Erosion control planFor the construction period
  4. Site alteration permitDrawings and application
  5. Pool permit drawingsEnclosure and grading
  6. Site planSetbacks, coverage, variance sketches
  7. Committee of AdjustmentPackage, coordinated with the city and conservation authority

How it runs

Process: 4 steps from first call to sign-off.

Four steps from the survey to the approval. We design the site so it drains, then take it through the department that reviews it.

  1. Survey & site review

    We start from a topographic survey of the lot, walk it, and note where water goes now: downspouts, swales, the neighbours’ grades and any catch basins.

  2. Zoning & by-law check

    Lot coverage, setbacks, hard-surface limits and the site alteration by-law are checked before the design, so the plan meets the rules it will be reviewed against.

  3. Grading & drainage design

    Proposed elevations, slopes and swales are set so runoff stays on your lot and reaches the street or a storm connection, with calculations where the city asks for them.

  4. Submission & approvals

    We file the grading plan with the building permit or the site alteration application, respond to the reviewer’s comments at no extra charge, and coordinate with the conservation authority where one is involved.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Property address and a recent topographic survey, if you have one
  • What you are building, paving or regrading
  • Architectural or pool drawings, if another designer prepared them
  • Photos of the lot, especially low spots and the boundaries with neighbours
  • Any city comments, site alteration notices or conservation authority letters
  • Existing drainage information: catch basins, downspout locations, storm connection

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

  • Halton

  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: site engineering, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • It depends on the municipality. Some require a professional engineer’s seal, while others also accept a surveyor or another qualified designer. Our grading plans are prepared by a licensed P.Eng, and we confirm the local requirement before starting.

  • A permit under a municipal site alteration by-law for changing the grade of a property: excavation, filling, removing soil or regrading. It is separate from the building permit and usually needs a grading plan and erosion control measures. Most GTA municipalities have such a by-law, and each one sets which jobs it covers.

  • That water from your lot does not run onto the neighbours’. Reviewers look for proposed grades that direct runoff to the street, a rear catch basin or a storm connection without crossing a property line. It is the single most common reason a grading plan is sent back, and it is what our designs are built around.

  • You need one when the project misses a zoning rule, such as a setback, a height or a lot coverage limit, by an amount the Committee of Adjustment can treat as minor. Check the setback first, because Ontario now reads minimum setbacks at 90 per cent on many serviced urban lots. The application involves drawings, public notice, a hearing and an appeal period. We prepare the drawings and coordinate it.

  • The authority’s own map is the first check: each conservation authority has to publish maps of its regulated areas and review them at least once a year. If the lot is mapped, or sits near a watercourse, valley or wetland, we confirm on site and ask for a pre-submission consultation, which the authority must hold when an applicant requests one. The authority and the city then review the same grading plan.

  • Fine Engineering’s construction side can coordinate the site work on projects we build. On design-only projects, the grading plan goes to your pool builder, landscaper or excavator, and we stay available for questions during construction.

Searched & answered

People Also Ask: what the GTA searches about site engineering.

Short answers to the site engineering questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • There is no flat price, because the work changes with the lot. The size and slope of the property, how much of it the project regrades, whether the city wants runoff calculations or a stormwater note, and whether a conservation authority is involved all change the scope. Survey and municipal fees are separate. Fine Engineering quotes after a free first consultation.

  • Compare the two sets of elevations first. Existing grades come from the topographic survey, and proposed grades are the finished levels the plan sets. Arrows show which way surface water runs, swales carry it along the lot, and the fall between spot elevations shows whether it drains away from the house. Fine Engineering will go through a plan with you on a free first call.

  • Often, yes. Ontario lets each municipality require a permit for filling, removing topsoil or changing the grade, and many GTA municipalities use that power for backyard work that moves soil or changes the drainage. Some instead review the grading with a building permit, or exempt minor landscaping. Fine Engineering checks the local by-law and prepares the application.

  • Widening a driveway usually needs permission from the municipality, because zoning by-laws limit driveway width and the share of the front yard that can be hard surface, and the curb cut belongs to the city. Repaving the same footprint often does not. Fine Engineering reviews the by-law and prepares the site plan where one is needed.

  • A basement with a full-height door to the rear yard, made possible by grading the yard down to the basement floor level. It changes the lot’s drainage, so municipalities generally require a grading plan with it, and some also require a site alteration permit. Fine Engineering designs walkout grading with the structure and the permit set.

  • Zoning decides what can go on a lot: the use, height, setbacks and coverage, under the municipal zoning by-law. A building permit decides how it is built, under the Ontario Building Code. The permit review checks zoning too, and a design that misses a zoning rule needs a minor variance before the permit can be issued. Fine Engineering reviews both before drawing.

Good to know

Site alteration permits and grading plans in Ontario

Ontario’s Municipal Act lets a local municipality require a permit to place or dump fill, remove topsoil or change the grade of land, and to attach conditions such as grading plans. Each GTA municipality uses that power its own way. Some issue a stand-alone site alteration permit for a pool or a regraded yard, while others keep the by-law for larger sites and review house lots with the building permit.

The Act exempts fill and grading that a site plan, subdivision or consent approval already requires as a condition. Whichever route applies, the Ontario Building Code sets one test for every lot: the building has to be located, or the site graded, so that water will not accumulate at or near the building and will not adversely affect adjacent properties.

Minor variances and the Committee of Adjustment

Under section 45(1) of the Planning Act, a Committee of Adjustment may approve a minor variance only if, in its opinion, the variance is minor, is desirable for the appropriate development or use of the property, and maintains the general intent and purpose of both the zoning by-law and the official plan. Those are the four tests, and the variance drawings have to make the case for each one.

Neighbours receive notice of the application and can be heard at the hearing. The right to appeal is narrower: since November 28, 2022, the Planning Act lets only the applicant, the Minister, specified persons and public bodies appeal the committee’s decision. A neighbour who objects has to do it at the hearing, so the drawings filed with the application are what both sides respond to.

Setbacks, minor variances and the 90 per cent rule

On a parcel of urban residential land outside the Greenbelt Area, Ontario now deems a zoning by-law’s minimum setback to be 90 per cent of the stated distance. Some prescribed areas are excluded. The rule comes from Planning Act subsection 34(1.4) and took effect through O. Reg. 545/06 on November 21, 2025.

Urban residential land means land in a settlement area where residential use is permitted, on municipal sewage and water. On a lot like that, an addition or a garage that falls a little short of a setback may not need a minor variance at all. We confirm the reading with the municipality’s zoning examiners before anyone applies to the Committee of Adjustment.

Conservation authority permits for grading and fill

Section 28 of Ontario’s Conservation Authorities Act prohibits development activity in hazardous lands, wetlands, river or stream valleys, and shoreline areas at risk of flooding or erosion within a conservation authority’s area, unless the authority issues a permit. O. Reg. 41/24 counts site grading and the placing or removal of fill as development activity, so a regraded yard can need that permit with nothing being built.

An apparent valley with stable slopes extends to the stable top of the bank plus 15 metres, and development within 30 metres of a wetland falls under the same prohibition. In TRCA’s area the permit must be in hand before the municipality issues a building permit. TRCA and the Central Lake Ontario Conservation Authority are due to merge on a transition date of February 1, 2027 or later.

Contact us

Survey in. Grades set. Water where it belongs.

Send us the survey and what you’re planning and we’ll tell you what the city will need, on a free first call.

First consultation free(416) 990-9179