Ground floor and up
Rear & side additions
Kitchens, family rooms and bedrooms added at the back or side, on new foundations tied to the old.
- Foundation & footings
- Tie-in to existing structure
- Roof junctions
- Matching or contrasting exterior
Home Additions · Burlington, Halton Region
Home additions in Burlington, from a rear kitchen extension to a full second storey or an addition built as a rental unit. We confirm what the existing footings and walls can carry, fit the design to your lot’s zoning, the trees the city protects and any backyard unit you may add later, and our crew builds it once the City of Burlington Building Department issues the permit.

What’s included
An addition is judged where it meets the old house: the beam that opens the wall, the roof that joins the existing one, the ducts that have to reach the new rooms. We design those joints first. In Burlington the package goes to the City of Burlington Building Department, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the slowest one, the tie-in to the house you are living in, planned around you.
We measure the house and lot, check what the by-law allows and look at the foundation and framing the addition will connect to.
Plans and elevations, structure, HVAC and electrical from one office, filed with the city and answered at no extra charge.
Excavation, foundation, framing and the opening into the existing house, then rough-ins, exterior and finishes, inspected at each stage.
Final inspection, permit closed, the house handed back as one building.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179The City of Burlington Building Department handles the zoning check, the permit and the inspections; Halton Region looks after regional roads and servicing. Burlington’s Site Alteration By-law 064-2014 can require a permit on a residential lot for a pool, regrading or infilling the yard, a patio or a retaining wall. If your addition comes with a regraded yard or a retaining wall at a walkout, that permit is filed beside the building permit.
If the lot is inside the regulated area of Conservation Halton, yes, and the Conservation Halton permit comes before the Burlington building permit. Beside a valley with stable slopes, the regulated area runs to the stable top of the bank plus 15 metres, which can decide how far back an addition goes.
Yes, if it fits the zoning, and that is the first thing we check. Burlington has two zoning by-laws in effect. The Burlington Residential Zoning By-law (By-law 09-2026) came into force on March 2, 2026 and applies only to the city’s residential zoned areas, and Zoning By-law 2020 was repealed only for those areas. Properties within the Niagara Escarpment Commission area get their zoning information from the NEC. We start with which of them covers your lot, then measure the addition against its setbacks, height and coverage. On a lot in the NEC area we confirm the route with the NEC first; elsewhere a shortfall goes to the Committee of Adjustment as a minor variance.
It depends on whether your house is inside it. Burlington’s Burlington Avenue-Ontario Street Heritage Conservation District was designated under Part V of the Ontario Heritage Act by By-law 08-2026, which City Council passed on March 2, 2026. For a house inside the district, we ask Burlington what it requires of an addition and design to that; outside it, the usual zoning and permit rules apply.
Yes. We take on home additions across Burlington, including Aldershot and Downtown Burlington, within an hour of our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address and a survey, if you have one; what you want to add and where; and photos of the side of the house and the yard where it would go. Send those and we tell you what the City of Burlington Building Department will ask for before we quote.
Yes, if the new foundation would be dug through its roots. Inside the Urban Planning Area, Burlington’s Private Tree By-law 040-2022 needs a permit before anyone injures a private tree 20 cm or more across at 1.37 m above the ground, and it also covers heritage trees and species at risk. Plotting them from the survey early lets us shape the footprint around a tree, and where that is not possible, the tree permit application runs alongside the City of Burlington Building Department’s review of the addition.
On an urban residential lot zoned for a detached, semi-detached or townhouse dwelling, it can: Burlington’s Residential Zoning By-law allows up to three additional units there, and a unit in an addition is part of the house, so it does not use up either of the by-law’s two detached unit places. The addition is then drawn with a fire separation from the main house and a door of the unit’s own, and the City of Burlington Building Department reviews the unit as part of the addition’s permit.
By email, since the City of Burlington Building Department takes applications as electronic submissions sent to buildingpermits@burlington.ca rather than through a portal. The City gives status by phone, so we call as the review goes on; the myfiles tracker will not show the addition, as it follows Pre-Building Approval applications only. When comments come back, we revise the structural or zoning sheets they name and send the set in again.
Two checks, one structural and one for zoning. Our P.Eng works out whether the existing footings and bearing walls can take another floor, or what reinforcement would let them, and the new roof height is held to the limit in By-law 09-2026 for a house in the residential zones, or Zoning By-law 2020 elsewhere. On a house from the earlier decades of Burlington’s growth south of Dundas Street, we confirm on site how its foundation was built before counting on it to carry a second floor.
It can. Ontario now treats a zoning by-law’s minimum setback as 90 per cent of the figure written, on urban residential land outside the Greenbelt and some prescribed areas, a rule in force since November 21, 2025. An addition that would have missed a side or rear setback in By-law 09-2026 by a small margin can therefore fit without going to the Committee of Adjustment, but the rule does not reach land that is not urban residential, which can include rural lots in Burlington’s north, so we confirm your lot qualifies before relying on it.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationSize, storeys, how much of the existing house is opened and the finishes set it, so a figure given before there is a design means little. Foundation and structure are the fixed part and finishes the variable one, and a minor variance or a new heating system adds its own line. Fine Engineering itemizes the addition after the site visit.
It depends on what the addition adds: a bedroom, a bigger kitchen or a rental unit. The first two let the owner stay on a lot they already own, and a rental unit can also bring in income. Fine Engineering’s Director is a Broker of Record and can say what the new space may be worth at resale before the owner spends.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Stop work and start on the drawings. A stop-work order usually means construction began without a permit or departed from the approved plans. Getting out of it takes a permit application that shows what was built and what is proposed, then whatever inspections the city asks for. Fine Engineering prepares those drawings and replies to the city’s letters.
Good to know
In Burlington the reviewer is the City of Burlington Building Department. Every Burlington lot sets its own terms: setbacks, lot coverage, what the existing foundation can carry and where the roof will join decide the addition before the first drawing.
We walk the site with the survey on a scheduled visit before anything is drawn, then file the home additions package to the City of Burlington Building Department’s own checklist.
Burlington has mostly single-detached houses in an urban area that has grown south of Dundas Street since the 1950s, with only limited rural housing in the north. With houses built over that long a span, we do not assume how one was framed: the beam that opens the old wall and the footings under a second storey are designed from what we find on site.
Burlington’s residential by-law lets an urban lot have up to two detached units, but only in a single accessory building. A rear addition takes depth from the same yard that building would need, so if a backyard unit is a possibility, we work out how deep the addition can go and where the accessory building could stand at the same time.
Under O. Reg. 299/19, unless the zoning by-law allows closer spacing or more coverage, any building with a unit in it must be 4 m or more from every other building on the lot that has one, and all buildings together can cover as much as 45 per cent of an urban residential lot. Your survey gets both lines before the addition is drawn, so you can see how much yard each addition depth leaves.
An addition gives the house rooms its furnace and ducts were never sized for. The 2024 Building Code sizes heating from a calculated heating load, using good practice such as CSA F280, so the set we email to the City of Burlington Building Department carries a heat loss for the house as it will be with the addition.
From that number our mechanical designer decides whether the existing furnace can carry the new rooms or they need equipment of their own, and draws the duct runs to reach them. Those mechanical sheets go in the same submission as the structural ones, so an examiner’s question about either is answered from one consistent set.
Contact us
Send us the address and what you want to add and we’ll tell you what fits, on a free first call.
First consultation free(416) 990-9179