Pressure-treated and composite decks with guards that meet the code’s height and load rules.
- Deck framing & spans
- Guard & stair design
- Composite or wood decking
- Lighting rough-in
Decks & Porches · Burlington, Halton Region
Deck builder for Burlington houses: decks, covered porches and rear canopies, with the footings, framing and guards drawn by our P.Eng and BCIN team. We keep the deck inside the setbacks of your lot’s zoning by-law, work the footings around trees the Private Tree By-law protects, and build once the City of Burlington Building Department issues the permit.

What’s included
Outdoor structures fail at the ground and at the house: footings that heave and ledgers that rot. We design both properly, then build what we drew. In Burlington the package goes to the City of Burlington Building Department, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the footing inspection setting the pace.
We look at the grade, the wall the structure will attach to, the access for materials and how you want to use the space.
Drawings for the permit, with the structure sized in-house, filed with the city and answered at no extra charge.
Locates, footings, framing, decking or roof, guards and stairs, inspected at the footing and framing stages.
Railings, lighting and finishes, the final inspection, and the permit closed.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179It can. Burlington’s by-law 064-2014 can call for a permit on a house lot when the yard is regraded or filled, or when a patio or a retaining wall goes in, and any of those can come with a deck. We read the by-law against the deck plan at the site visit, before anything is filed with the City of Burlington Building Department.
Where the lot is in a regulated area, yes. Section 28 of the Conservation Authorities Act bars development in hazardous lands, wetlands, river or stream valleys and shorelines at risk of flooding or erosion unless the authority issues a permit, and building a deck there counts. So does the yard work around the deck, since Ontario Regulation 41/24 treats site grading and placing fill as development activity. We check Conservation Halton’s mapping first, since that permit comes ahead of the one from the City of Burlington Building Department.
Yes. We take on decks & porches across Burlington, including Aldershot and Downtown Burlington, within an hour of our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address; photos of the yard and the wall the structure would attach to; and rough size, and whether you want it covered. Send those and we tell you what the City of Burlington Building Department will ask for before we quote.
It can. Inside the Urban Planning Area the by-law needs a permit before a private tree 20 cm or more in diameter, measured 1.37 m up the trunk, is injured, and a footing hole dug through its roots can do that; heritage trees and species at risk are protected as well. We show those trees on the deck plan, including any of the neighbours’ that overhang the fence, and space the footings to bridge the roots or apply for the tree permit alongside the deck permit from the City of Burlington Building Department.
The setback comes from whichever by-law zones your lot: the Residential Zoning By-law 09-2026 for the residential zones on its Schedule A, Zoning By-law 2020 for other areas, or the Niagara Escarpment Commission for a property in its area. Once the address tells us which applies, the deck is drawn to that source’s side and rear setbacks, so the City of Burlington Building Department’s review can stay on the structure.
We email the application and drawings to buildingpermits@burlington.ca, because Burlington does not take permit applications through an online portal. As a lower-tier municipality inside Halton Region, Burlington does its own plan review, permits and deck inspections through the City of Burlington Building Department, and it answers status questions by phone. We make those calls for you while the deck is under review.
A roof over the porch puts its weight on posts, footings and the house wall, so the drawings go further than an open deck’s. They add the rafters or trusses and how they are tied down, the header beam and the posts under it, a footing sized for each post, and the ledger detail where the roof frames into the house, along with the porch’s distances to the lot lines under your zoning by-law. All of it goes to the City of Burlington Building Department in the emailed set.
Yes. Burlington’s houses vary widely in age, as the urban area has been growing south of Dundas Street since the 1950s, so before the new ledger goes on, we take off the old one and look at the rim joist and wall framing it was bolted to. A deck that grows in size or height is a new footprint for zoning, so it is measured against the setbacks in By-law 09-2026 or Zoning By-law 2020 rather than assumed to fit because the old one did.
The building permit still comes from the City of Burlington Building Department, but two things can differ on the city’s limited rural land. If the property is in the Niagara Escarpment Commission’s area, the deck’s setbacks come from NEC zoning instead of a city by-law, and the Private Tree By-law’s permit rule applies only inside the Urban Planning Area Boundary, so we check which side of that line the lot is on.
Yes. We draw the footings, framing, guards and stairs, check the deck against the setbacks for your lot and any tree the Private Tree By-law protects, and email the set to the City of Burlington Building Department. Your contractor then builds from those sheets, and the City’s inspectors check the deck against them.
Searched & answered
Short answers to the decks & porches questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationUsually, yes. Each municipality sets its own line. The GTA rules we work with go by the deck’s height above the ground, and some also count any deck fastened to the house. A roofed porch fastened to the house needs one under each of them. Cities word the rule differently, so Fine Engineering checks your municipality’s own wording before a deck is drawn.
Start with drawings and, in most cases, a permit, then build from the ground up. Once the permit is issued, call for utility locates, dig the footings to the depth your soil needs and call in each inspection the permit lists as that stage is reached. Then come the framing, the decking, the guards and stairs, and the final inspection. Fine Engineering draws and builds decks across the GTA.
As part of the deck, on the same permit drawings. The stringers are cut to the drawing and fastened to the deck framing, and the guard rule that applies to the deck applies to the open sides of the stair too. Fine Engineering draws the stair, its stringers and its guard on the permit set.
Either the main roof carries down over the porch, or a lower shed roof hangs off the house wall. Both put new roof and snow load on the house, so the join needs flashing and the existing wall and roof framing has to carry it. Fine Engineering checks that framing before the porch roof is drawn.
For a permit, the zoning by-law decides. Zoning is applicable law, so a permit is only issued for work that complies with it. If a covered porch would take the lot past what its by-law allows, the owner makes the porch smaller or gets a minor variance first. Fine Engineering reads the by-law for your lot, including how it treats a roofed porch, before the porch is drawn.
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
Good to know
In Burlington the reviewer is the City of Burlington Building Department. Every Burlington lot sets its own terms: the height above grade, the wall the deck fastens to and the soil under the footings decide the design before anything is dug.
We walk the site with the survey on a scheduled visit before anything is drawn, then file the decks & porches package to the City of Burlington Building Department’s own checklist.
Most housing in Burlington is single-detached houses in an urban area that has grown south of Dundas Street since the 1950s, with only limited rural housing in the north. A deck replaced on one of the older houses may predate today’s guard rules, so the new one is drawn to the current code.
A front porch is the part of a house that faces the street, so on a house inside the Burlington Avenue-Ontario Street Heritage Conservation District it is the first thing the district’s requirements are likely to reach. The district dates from March 2026, when Council designated it under Part V of the Ontario Heritage Act through By-law 08-2026, so a porch design drawn before then is worth checking again.
Before drawing it, we ask the City which parts of the porch the district’s requirements cover, such as its roof shape, columns, railings or materials. The structural set, with footings, framing and guard details, follows to the City of Burlington Building Department once that is known.
A deck set is short but exact. It starts with the site plan from your survey, giving the deck’s distance to every lot line and the trunk of any protected tree near a footing. The footing plan gives the size, spacing and depth of each pier, and the framing plan gives the beam and joist sizes, how far each spans and how the ledger is bolted to the house.
Guard heights and openings, and the stair rise, run and handrail, are detailed to the Building Code. The set goes to the City by email, since Burlington has no upload portal, and the City of Burlington Building Department’s inspectors later check the built deck against these same sheets.
Contact us
Send us a few photos of the yard and we’ll tell you what the permit needs, on a free first call.