
The way in
Separate entrance
A new exterior door cut into the foundation, with the stairwell, guard and drainage designed so the opening does not weaken the wall.
- Foundation opening design
- Stairwell & drainage
- Guards & lighting
- Frost & waterproofing
Legal Basements
A second unit with its own entrance, fire separations, egress and heating, designed, permitted and built by one team. The Vaughan unit on our project list is one: code-compliant, with its own entrance, and bringing in rent.

What’s included
A legal unit is a list of code items, and the inspector checks each one. We design to that list, build to it, and book the inspections in the order the city wants them.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
06 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from a bare basement to a closed permit, with the inspections built into the schedule.
We measure the ceiling, look at the windows, the entrance options and the mechanical room, and tell you whether the basement can be made legal and what it will take.
Layout, separations, the structural opening and HVAC are drawn in one office and filed with the municipality. City comments are answered at no extra charge.
Entrance, framing, rough-ins, insulation and rated assemblies go in, inspected at each stage.
Kitchen, bathroom, flooring and doors, then the final inspection and the closed permit.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Your part is a few decisions. Before the visit you send the ceiling height and photos and tell us whether the unit is for family or a tenant, which shapes the layout. After it you choose the exit route and whether the suite shares your furnace, approve the drawings before we file them, and pick the finishes during the build.
A building permit from your local building department, and a final inspection that passes. To pass, the suite needs the ceiling height the code sets, a fire separation from the main house, linked smoke alarms, carbon monoxide alarms where the code calls for them and a safe way out. We check each item at the first visit.
Not necessarily. The 2024 Building Code sets a minimum ceiling height for a secondary suite, and where a basement falls short, lowering the floor by underpinning is the usual answer. That is structural work, so our P.Eng designs it and it goes on the permit drawings with the rest of the unit.
Yes. Our engineer designs the opening so the wall still carries the house, plus the stairwell, guard and drainage around it, and we coordinate the build. A door is one way out of several, and we show you the other exit routes at the site visit.
It can. A shared furnace is one route, and separate heating is the other, which lets a tenant set their own temperature. Either way, our mechanical designer draws the heating for both units on the permit drawings.
The permit review comes first, then construction runs in stages around inspections. A basement that already has the height and a usable entrance is quicker than one that needs underpinning and a new door cut through the foundation. We give a schedule with the quote.
There is no single figure. The cost follows what your basement is missing against the code, which changes from house to house, so we price the job once the site visit has shown the gap. The first consultation is free, and the quote lists design and permit fees apart from construction.
Usually. The city treats it as a new application: drawings of what exists and what has to change, then inspections that sometimes mean opening walls. We prepare the drawings, answer the city and coordinate the corrective work.
Searched & answered
Short answers to the legal basements questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA legal basement is a basement apartment that meets the Building Code and the local zoning: a self-contained second unit with its own kitchen and bathroom. The code calls it a secondary suite, and Ontario’s planning rules call it an additional residential unit. Fine Engineering designs and permits these units across the GTA and coordinates the build.
At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
For many homeowners, yes. A legal second unit can earn rent and add property value, and because it was built under a permit, it avoids the trouble an unpermitted suite causes when the house is sold. The return depends on how much the basement needs, whether that is more headroom, a new exit or fire separation. Fine Engineering prices that work before any drawing starts.
A heat- or energy-recovery ventilator swaps stale indoor air for fresh outdoor air and passes heat between the two airstreams on the way. A new house, or a permit with HVAC work, usually needs a mechanical ventilation design, and Toronto Building asks for one with every HVAC permit application. An HRV or ERV is the usual way to meet it. Fine Engineering sizes them in its HVAC designs.
Good to know
Ontario’s 2024 Building Code makes 1.95 m the lowest ceiling a secondary suite may have, with 1.85 m of clear height allowed under beams and ducts. The suite also needs a fire separation from the rest of the house. Where the house has stood at least five years, the renovation rules accept 30 minutes, or 15 minutes for the floor between units if interconnected smoke alarms are in every unit and common area.
The alarms must be linked, by wire or wirelessly, so one sets off the rest, and shared spaces outside the units need them too. A suite needs carbon monoxide alarms when it has a fuel-burning appliance or flue, takes heated air from a fuel-burning forced-air furnace, or shares a wall, floor or ceiling with a garage or a room with such an appliance or flue. They go next to each bedroom, and on any storey of the suite with no bedroom.
Every basement unit needs a safe way out. In a house at least five years old, the code’s renovation rules accept three: an exterior door that serves only the suite, a shared exit behind a 30-minute fire separation, or a route through the other unit with an added escape window. The last two also need the house’s smoke alarms linked.
The escape window has to open from inside without tools, with a clear opening of at least 0.38 m² and no side narrower than 460 mm. Its sill can sit no higher than 900 mm above the floor and no more than 1,000 mm above or below the ground outside, and a window well needs 1,000 mm of clear space in front of the window. We measure each candidate window against those numbers.
Since November 2022 the Planning Act has stopped a zoning by-law from prohibiting up to three units on a serviced urban residential lot: three in a detached house, semi or rowhouse, or two in the house and one in an ancillary building on the lot. A by-law also cannot set a minimum floor area for an additional unit, or ask for more than one parking space for it.
Under O. Reg. 299/19 the unit needs that one space for its occupant, and a tandem space counts. None is needed where the zoning by-law requires no parking for the main house, or requires that none be provided for the unit. Anyone may live in the unit, related to the household upstairs or not, and nobody living there has to own the lot. The unit is allowed however old the house is.
The code list is the same for every basement, so the cost depends on how far a given basement is from meeting it. A ceiling already at code height, an exit that works without cutting a new door, drains deep enough for a second kitchen and bathroom, and an electrical panel with room to spare each keep the scope small.
Underpinning to gain height, a new entrance through the foundation, fire-rated assemblies under a finished ceiling, a larger window and well, or a service upgrade each add to it. The site visit shows which of these your basement needs.
Contact us
Send us the ceiling height and a few photos and we’ll tell you whether the basement can be made legal, on a free first call.
First consultation free(416) 990-9179