Ground floor and up
Rear & side additions
Kitchens, family rooms and bedrooms added at the back or side, on new foundations tied to the old.
- Foundation & footings
- Tie-in to existing structure
- Roof junctions
- Matching or contrasting exterior
Home Additions · Barrie
Home additions in Barrie, whether rear, side or a second storey, designed, permitted and built by one team. We read the setbacks and height from By-law 2009-141, or from the older by-law some transferred lots keep, size the foundation and beams that join the addition to the house, and file it with the City of Barrie Building Services through APLI.

What’s included
An addition is judged where it meets the old house: the beam that opens the wall, the roof that joins the existing one, the ducts that have to reach the new rooms. We design those joints first. In Barrie the package goes to the City of Barrie Building Services, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the slowest one, the tie-in to the house you are living in, planned around you.
We measure the house and lot, check what the by-law allows and look at the foundation and framing the addition will connect to.
Plans and elevations, structure, HVAC and electrical from one office, filed with the city and answered at no extra charge.
Excavation, foundation, framing and the opening into the existing house, then rough-ins, exterior and finishes, inspected at each stage.
Final inspection, permit closed, the house handed back as one building.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Barrie is a single-tier city, so the City of Barrie Building Services checks the zoning on the application, issues the permit and carries out the inspections. We file the addition in APLI, the City’s online tool, and its email notices tell us each time the review moves.
If the lot is inside the regulated area of the Lake Simcoe Region Conservation Authority (LSRCA), yes, and the LSRCA permit comes before the Barrie building permit. The authority must publish maps of its regulated areas and review them at least once a year, so we check the current map against your survey. The west of the city is under the Nottawasaga Valley Conservation Authority. On those lots we make the same check with the authority that covers them.
Yes, if it fits the zoning, and that is the first thing we check. Barrie’s Comprehensive Zoning By-law 2009-141 was approved by City Council in August 2009. A Community Planning Permit System replaces it within the Allandale Major Transit Station Area only. Innisfil Zoning By-law 054-04 still applies to some Secondary Plan lands transferred to the City in 2009, and Springwater Zoning By-law 5000 and Oro-Medonte Zoning By-law 97-95 still apply to the boundary adjustment lands transferred to the City on January 1, 2026. We find the by-law for your lot and measure the addition against its setbacks, height and coverage. Inside the transit station area we confirm the planning permit route with the city; elsewhere a shortfall goes to the Committee of Adjustment as a minor variance.
Yes. We take on home additions across Barrie, including Allandale and Painswick, within an hour of our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address and a survey, if you have one; what you want to add and where; and photos of the side of the house and the yard where it would go. Send those and we tell you what the City of Barrie Building Services will ask for before we quote.
It can. Barrie’s Private Tree By-law 2014-115 applies where trees are part of a woodlot of half an acre or larger, and it covers injuring them as well as removing them, so footings dug into the roots of woodlot trees on your side of the lot line can need the City’s approval first. We map those trees on the survey, and the addition either keeps clear of them or the tree question is settled before the City of Barrie Building Services reviews the drawings.
That depends on how the by-law for your lot defines coverage: By-law 2009-141 for most of Barrie, or an Innisfil, Springwater or Oro-Medonte by-law on some transferred land. We total the two footprints first, and if the sum runs over, the choice is a smaller porch or a minor variance, settled before the City of Barrie Building Services will issue the permit.
Possibly. Digging for the foundation and reshaping the ground around it is the kind of work Barrie’s site alteration by-law covers, and that by-law sits apart from the building permit. Early in the design we ask the City of Barrie Building Services whether the addition’s permit takes it in or a second application is needed, and the grading plan our P.Eng draws serves both.
The zoning sets the first limit: the height allowed in your zone, under By-law 2009-141 for most Barrie houses, measured from a point that by-law defines, so the levels on your survey decide how much room is left above the existing roof. The second is structural, since our P.Eng has to confirm the walls and footings below can carry another floor. The City of Barrie Building Services reviews the height and the stamped structure in the same permit set.
Possibly. Since November 21, 2025, Ontario has treated each minimum setback in a by-law as 90 per cent of its written distance on urban residential land, apart from the Greenbelt Area and some prescribed areas, and on a side yard that can widen an addition slightly. We take the setback for your zone from By-law 2009-141, confirm the lot qualifies, and draw to the reduced distance only once the City of Barrie Building Services agrees.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationSize, storeys, how much of the existing house is opened and the finishes set it, so a figure given before there is a design means little. Foundation and structure are the fixed part and finishes the variable one, and a minor variance or a new heating system adds its own line. Fine Engineering itemizes the addition after the site visit.
It depends on what the addition adds: a bedroom, a bigger kitchen or a rental unit. The first two let the owner stay on a lot they already own, and a rental unit can also bring in income. Fine Engineering’s Director is a Broker of Record and can say what the new space may be worth at resale before the owner spends.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Stop work and start on the drawings. A stop-work order usually means construction began without a permit or departed from the approved plans. Getting out of it takes a permit application that shows what was built and what is proposed, then whatever inspections the city asks for. Fine Engineering prepares those drawings and replies to the city’s letters.
Good to know
In Barrie the reviewer is the City of Barrie Building Services. Every Barrie lot sets its own terms: setbacks, lot coverage, what the existing foundation can carry and where the roof will join decide the addition before the first drawing.
We walk the site with the survey on a scheduled visit before anything is drawn, then file the home additions package to the City of Barrie Building Services’s own checklist.
Barrie has high-density waterfront condos built since the 1980s beside established suburban neighbourhoods. Only the houses in those neighbourhoods can take an addition: a family room at the back, a main-floor bedroom or a second storey, each tied into a foundation our P.Eng looks at on the first visit.
If the house already has a legal basement unit, the addition is planned around it. The unit’s fire separation and its way out have to survive the work, and any new duct or drain that crosses between the two homes is detailed so the separation stays whole.
The addition can hold a unit of its own as well. Barrie counts an attached unit among the three additional units a residential lot can take, so a house with a basement unit could gain a second one in the addition and still leave room for a coach house, within the zone’s standards, which the City of Barrie Building Services checks for each unit.
The application the City of Barrie Building Services receives through APLI carries the site plan with the addition’s distance to each lot line, existing and new floor plans and elevations, stamped structural sheets for the foundation and framing, and the heating design. Ontario’s 2024 Building Code asks for the new rooms’ heating to be based on a heat-load calculation, so that calculation is in the file too.
Contact us
Send us the address and what you want to add and we’ll tell you what fits, on a free first call.