
Ground floor and up
Rear & side additions
Kitchens, family rooms and bedrooms added at the back or side, on new foundations tied to the old.
- Foundation & footings
- Tie-in to existing structure
- Roof junctions
- Matching or contrasting exterior
Home Additions · Toronto
Home additions in Toronto, designed, permitted and built: rear additions and second storeys on prewar and postwar houses, semis that share a party wall, and additions that add a unit under the city’s multiplex rules. We measure each one against Zoning By-law 569-2013 and prepare the energy and HVAC submissions Toronto Building asks for.

What’s included
An addition is judged where it meets the old house: the beam that opens the wall, the roof that joins the existing one, the ducts that have to reach the new rooms. We design those joints first. In Toronto the package goes to Toronto Building, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the slowest one, the tie-in to the house you are living in, planned around you.
We measure the house and lot, check what the by-law allows and look at the foundation and framing the addition will connect to.
Plans and elevations, structure, HVAC and electrical from one office, filed with the city and answered at no extra charge.
Excavation, foundation, framing and the opening into the existing house, then rough-ins, exterior and finishes, inspected at each stage.
Final inspection, permit closed, the house handed back as one building.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179In Toronto, building an addition to an existing house needs a building permit. Toronto’s examples include second or third storey additions, attached garages, carports, sunrooms, solariums, porches and decks. Toronto is a single-tier city, so Toronto Building checks the zoning on the application, issues the permit and carries out the inspections. Toronto reviews lot grading through the building permit. On an ordinary lot the grades for an addition go on the permit drawings.
If the lot is in a TRCA Regulated Area, yes: building anything there needs a TRCA permit, and Toronto will not issue the building permit until you have it. TRCA also asks for a pre-submission consultation, which we book as soon as the survey shows a valley or creek near the house.
Yes, if it fits the zoning, and that is the first thing we check. Toronto’s comprehensive, city-wide zoning by-law is Zoning By-law 569-2013, although some properties are still subject to the zoning by-laws of the former pre-amalgamation municipalities. We check which of them governs your lot, then measure the addition against that by-law’s setbacks, height and coverage.
If your house is in one, that district’s rules apply to the addition. Toronto has Heritage Conservation Districts designated under Part V of the Ontario Heritage Act. They include Blythwood Road, Cabbagetown (North, Northwest, Metcalfe and South), Cabbagetown Southwest, Draper Street, East Annex, Fort York, Garden District, Harbord Village, Historic Yonge Street, Kensington Market, King-Spadina, Kingswood Road South, Lyall Avenue, West Annex Phase 1: Madison Avenue, Parkdale Main Street, Queen Street West, Riverdale, Rosedale (South and North), St. Lawrence Neighbourhood, Teiaiagon-Baby Point, Union Station, Weston Phase 1, Wychwood Park and Yorkville - Hazelton. We check your address against the district boundaries first.
Yes. We take on home additions across Toronto, including North York and Scarborough, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address and a survey, if you have one; what you want to add and where; and photos of the side of the house and the yard where it would go. Send those and we tell you what Toronto Building will ask for before we quote.
It can. A rear addition’s footings are dug into the yard, and Chapter 813 of the Toronto Municipal Code needs a permit before anyone injures a private tree of 30 cm or more in diameter, measured 1.4 m above the ground; City street trees are protected at every size. We locate the trees from your survey before the footprint is fixed, so the addition can step back from a root zone, or the tree permit is applied for while Toronto Building reviews the set.
Yes, if the unit count fits the zoning. Toronto’s rules allow multiplexes of up to four units anywhere in the city and up to six in the Toronto and East York District and Ward 23, so an addition can hold a second, third or fourth unit where the lot qualifies. The new unit is drawn as a separate dwelling, with the separation and exits the Building Code asks for, and we confirm the lot under By-law 569-2013 or its former municipal by-law before the addition is sized around it.
It may. Since November 21, 2025, a minimum setback in a zoning by-law has been deemed to be 90 per cent of the stated distance on urban residential land outside the Greenbelt, with hazardous lands and some other areas excluded. On a narrow Toronto lot, that margin can decide whether a side or rear addition needs a minor variance under By-law 569-2013, so we confirm with Toronto Building’s zoning examiners how it applies to your lot before relying on it.
You can appeal or change the design. In Toronto, appeals of Committee of Adjustment decisions go to the Toronto Local Appeal Body, and since November 28, 2022 only the applicant, the Minister, specified persons and public bodies have been able to appeal. The other route is a smaller variance and a fresh application, for example with a second storey stepped back from the side lot line. Either way Toronto Building cannot issue the permit until the variance is final or the design meets By-law 569-2013, and we redraw the addition for whichever route you choose.
Toronto’s guide for small residential additions asks for the setbacks, the building area, the lot coverage and the grade elevations, the last so Toronto Building’s examiner can confirm the height under Zoning By-law 569-2013, or under the former municipal by-law that still governs some lots. All of it is measured from a survey, so if yours does not show the house as it stands now, including any earlier addition or garage, we arrange a new one.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationMostly the addition itself: its size, and what the old foundation and walls can carry. On a Toronto lot there may also be a minor variance at the Committee of Adjustment, a second permit when a semi’s party wall is built higher, tree or ravine permits, and the SB-12 energy summary and HVAC calculations Toronto Building asks for. Fine Engineering prices the job after a free site visit.
Size, storeys, how much of the existing house is opened and the finishes set it, so a figure given before there is a design means little. Foundation and structure are the fixed part and finishes the variable one, and a minor variance or a new heating system adds its own line. Fine Engineering itemizes the addition after the site visit.
It depends on what the addition adds: a bedroom, a bigger kitchen or a rental unit. The first two let the owner stay on a lot they already own, and a rental unit can also bring in income. Fine Engineering’s Director is a Broker of Record and can say what the new space may be worth at resale before the owner spends.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Good to know
In Toronto the reviewer is Toronto Building. Every Toronto lot sets its own terms: setbacks, lot coverage, what the existing foundation can carry and where the roof will join decide the addition before the first drawing.
We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the home additions package to Toronto Building’s own checklist.
Toronto’s housing is prewar and postwar houses on narrow lots across the inner suburbs, with most recent growth in mid- and high-rise apartments. On a narrow lot the side yards leave little room to build out, so an addition usually goes up or to the back, and a second storey depends on what the old foundation and walls can carry. Our P.Eng checks the footings and framing at the site visit.
In Toronto, a permit for an addition to a house must include an Energy Efficiency Design Summary showing compliance with the Building Code’s Supplementary Standard SB-12. Toronto’s form comes in prescriptive and performance versions, and we pick the one that suits the design.
When an addition’s permit includes HVAC work in Toronto, the application must include heat loss and heat gain calculations, duct design calculations, and mechanical ventilation calculations and design. We prepare the energy summary and those calculations from one HVAC design, so the forms, the drawings and what gets installed agree.
When an addition does not conform with Toronto’s Zoning By-law, the owner needs either a rezoning or a minor variance from the Committee of Adjustment. Toronto says minor variances are used for issues such as small changes to setback or parking requirements, while rezonings handle major revisions. The city recommends a zoning review by Toronto Building first, through a Zoning Applicable Law Certificate.
To approve a minor variance, the Committee must be satisfied that the general intent and purpose of the Official Plan and of the Zoning By-law are maintained, that the proposal is appropriate for the development of the land or building, and that the variance is minor. Once it approves, the building permit application can go in, and we draw the variance and permit sets from one design.
Where a Toronto house on a narrow lot is a semi or a row house, it shares a party wall with the house next door. If an addition involves that wall, such as a second storey that builds it higher or a rear addition framed into it, Toronto Building needs a permit for every property the party wall separates, so the neighbouring address goes on the application as well.
That brings your neighbour into the project from the start. We draw the party wall as it is and as it will be, and raise the second permit with both owners before the set is filed, so nobody hears about it first from the examiner.
Inside a ravine and natural feature protection area, Chapter 658 of the Toronto Municipal Code bars placing fill or changing the grade without a permit, and Urban Forestry receives those applications. Digging for an addition’s foundation and regrading around it both count, so on a ravine lot that permit belongs in the plan from the first sketch.
It is a separate approval from any TRCA permit, so a lot at the top of a valley can need one from each as well as the building permit. We check your address for both when the survey comes in, before the addition’s size is settled.
Contact us
Send us the address and what you want to add and we’ll tell you what fits, on a free first call.
First consultation free(416) 990-9179