Ground floor and up
Rear & side additions
Kitchens, family rooms and bedrooms added at the back or side, on new foundations tied to the old.
- Foundation & footings
- Tie-in to existing structure
- Roof junctions
- Matching or contrasting exterior
Home Additions · Kitchener, Region of Waterloo
Home additions in Kitchener for houses you mean to keep: rear and side additions on the older homes near the core and Victoria Park, second storeys on postwar houses in Doon and Huron, and additions built as a separate unit. Our P.Eng checks what the existing foundation can carry, we measure the design against zoning bylaw 2019-051 or 85-1, and our crew builds it once the permit is issued.

What’s included
An addition is judged where it meets the old house: the beam that opens the wall, the roof that joins the existing one, the ducts that have to reach the new rooms. We design those joints first. In Kitchener the package goes to the City of Kitchener Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the slowest one, the tie-in to the house you are living in, planned around you.
We measure the house and lot, check what the by-law allows and look at the foundation and framing the addition will connect to.
Plans and elevations, structure, HVAC and electrical from one office, filed with the city and answered at no extra charge.
Excavation, foundation, framing and the opening into the existing house, then rough-ins, exterior and finishes, inspected at each stage.
Final inspection, permit closed, the house handed back as one building.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179The City of Kitchener Building Division handles the zoning check, the permit and the inspections; the Region of Waterloo looks after regional roads and servicing. We apply through the City’s online services portal, where the permit drawings stay on file and the inspections are booked as the addition goes up.
If the lot is inside the regulated area of the Grand River Conservation Authority (GRCA), yes, and the GRCA permit comes before the Kitchener building permit. The regulated area also takes in land within 30 metres of a wetland, so we measure from any wetland near the lot before the addition is placed.
Yes, if it fits the zoning, and that is the first thing we check. Kitchener currently has two zoning bylaws, the newer zoning bylaw 2019-051 that covers about 80% of properties and the older zoning bylaw 85-1 that still covers about 20%, so owners need to confirm which one applies to their lot before applying for permits. We make that check for your address first, then measure the addition against the setbacks, height and coverage of the by-law that applies. A shortfall goes to the Committee of Adjustment as a minor variance before the City of Kitchener Building Division will issue the permit.
Each district sets its own requirements, so the first question is whether your house is in one of them. Kitchener has four heritage conservation districts designated under Part V of the Ontario Heritage Act: St. Mary’s, Upper Doon, Victoria Park and Civic Centre. For a house inside one, we ask Kitchener what that district requires of an addition and design to it.
Yes. We take on home additions across Kitchener, including Doon Pioneer Park and Stanley Park, within ninety minutes of our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address and a survey, if you have one; what you want to add and where; and photos of the side of the house and the yard where it would go. Send those and we tell you what the City of Kitchener Building Division will ask for before we quote.
Height, and the house underneath. The new storey has to fit the height limit in whichever zoning bylaw covers the lot, 2019-051 for most of Kitchener or 85-1 for the rest, and our P.Eng checks that the footings and bearing walls can take the extra floor. On a postwar house in Doon or Huron we also look at how the roof was framed, because that decides how much of it has to come off.
Yes, where the lot allows it. Kitchener lets an additional unit go inside the house or in an addition to it, counted toward the lot’s four, unless the lot’s width or servicing holds it to one or two units. We draw the fire separation between the addition and the house, the new unit’s entrance and its plumbing into the same set for the City of Kitchener Building Division.
Only if your lot is larger than one acre. On those lots Kitchener’s private tree bylaw, Chapter 692, covers trees 10 cm or more in diameter, and taking one down for the new foundation may need a tree conservation permit, so we plot them from the survey before the footprint is fixed and the set goes to the City of Kitchener Building Division. On a smaller lot this bylaw does not apply, though we still keep the excavation clear of the roots of any tree you want to keep.
Where the lot qualifies, yes. Since November 21, 2025, Ontario reads a zoning bylaw’s minimum setback on urban residential land outside the Greenbelt as 90 per cent of the distance written, and that covers the setbacks in zoning bylaws 2019-051 and 85-1 wherever a lot meets those conditions. We measure your addition against the written figure and the reduced one, so you know before the set goes to the City of Kitchener Building Division whether a minor variance is still needed.
It might, as an approval separate from the building permit. Kitchener’s site alteration by-law covers excavation, fill and changes to the grade, and an addition that lowers or raises the yard around it can fall under it. We raise it with the City of Kitchener Building Division while the design is still being drawn, and the grading plan shows the finished levels either way.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationSize, storeys, how much of the existing house is opened and the finishes set it, so a figure given before there is a design means little. Foundation and structure are the fixed part and finishes the variable one, and a minor variance or a new heating system adds its own line. Fine Engineering itemizes the addition after the site visit.
It depends on what the addition adds: a bedroom, a bigger kitchen or a rental unit. The first two let the owner stay on a lot they already own, and a rental unit can also bring in income. Fine Engineering’s Director is a Broker of Record and can say what the new space may be worth at resale before the owner spends.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Stop work and start on the drawings. A stop-work order usually means construction began without a permit or departed from the approved plans. Getting out of it takes a permit application that shows what was built and what is proposed, then whatever inspections the city asks for. Fine Engineering prepares those drawings and replies to the city’s letters.
Good to know
In Kitchener the reviewer is the City of Kitchener Building Division. Every Kitchener lot sets its own terms: setbacks, lot coverage, what the existing foundation can carry and where the roof will join decide the addition before the first drawing.
We walk the site with the survey on a scheduled visit, and combine it with the measure-up where we can, before anything is drawn, then file the home additions package to the City of Kitchener Building Division’s own checklist.
Kitchener has older homes around the core and Victoria Park with postwar and newer suburban subdivisions in Doon and Huron. Near the core, an older house is added to with its age in mind, because the foundation, the walls and the roof line all have to meet the new work. On a postwar house in the suburbs, a second storey depends on whether the foundation will carry it, which our P.Eng checks first.
Ontario’s 2024 Building Code sizes a house’s heating from a calculated heating load, using good engineering practice such as CSA F280, and cooling the same way where it is installed. An addition changes that load, so we calculate it again for the whole house instead of the new rooms alone.
On an older house near the core or Victoria Park, the furnace and ducts may have been sized for the house as it was, and the new calculation tells us whether they can take the addition or need replacing. The heat-loss figures and the duct layout go on the mechanical sheet the City of Kitchener Building Division reviews with the addition.
The set starts with a site plan drawn from your survey, showing the addition’s distance to each lot line under zoning bylaw 2019-051 or 85-1 and the lot coverage before and after. Floor plans and elevations follow, then the structure: the new footings, the beam or lintel where the old wall opens, and the connection where the new roof meets the old one.
Comments from the City of Kitchener Building Division’s examiners come back to us, and we answer each one in writing with the revised sheets. The inspectors then check the addition as built against the approved set.