Ground floor and up
Rear & side additions
Kitchens, family rooms and bedrooms added at the back or side, on new foundations tied to the old.
- Foundation & footings
- Tie-in to existing structure
- Roof junctions
- Matching or contrasting exterior
Home Additions · Markham, York Region
Home additions in Markham, designed, permitted and built: rear and side additions, second storeys and additions that hold a new unit. We measure each one against the zoning for your lot, design the beams that open the old house to the new rooms, and file the set with the Building Standards Department through ePLAN, whether the street is in a heritage district or a newer planned community.

What’s included
An addition is judged where it meets the old house: the beam that opens the wall, the roof that joins the existing one, the ducts that have to reach the new rooms. We design those joints first. In Markham the package goes to the City of Markham Building Standards Department, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the slowest one, the tie-in to the house you are living in, planned around you.
We measure the house and lot, check what the by-law allows and look at the foundation and framing the addition will connect to.
Plans and elevations, structure, HVAC and electrical from one office, filed with the city and answered at no extra charge.
Excavation, foundation, framing and the opening into the existing house, then rough-ins, exterior and finishes, inspected at each stage.
Final inspection, permit closed, the house handed back as one building.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179The City of Markham Building Standards Department handles the zoning check, the permit and the inspections; York Region looks after regional roads and servicing. Markham’s Site Alteration By-law 2011-232 covers larger sites; detached infill and additions go through the city’s Residential Infill Grading and Servicing (RIGS) review instead. An addition goes through RIGS, so its grading and servicing drawings are prepared for that review together with the permit set.
If the lot is in a TRCA Regulated Area, yes: building anything there needs a TRCA permit, and Markham will not issue the building permit until you have it. TRCA also asks for a pre-submission consultation, which we book as soon as the survey shows a valley or creek near the house.
Yes, if it fits the zoning, and that is the first thing we check. Markham’s Comprehensive Zoning By-law 2024-19 was approved by the Ontario Land Tribunal on September 19, 2024 on a city-wide basis, except for lands with remaining site-specific appeals, and is deemed to have come into force on January 31, 2024. Not every property in the City is covered by it, and owners can check the City’s interactive zoning map to see whether their property is affected. We run that check for your address first, then measure the addition against the by-law that covers the lot. If it misses a setback or the coverage limit by a little, we take a minor variance to the Committee of Adjustment before filing the permit.
Each district sets its own requirements, so the first question is whether your house is in one of them. Markham has four Heritage Conservation Districts protected under Part V of the Ontario Heritage Act: Thornhill, Markham Village, Buttonville and Unionville. For a house inside one, we ask Markham what that district requires of an addition and design to it.
Yes. We take on home additions across Markham, including Unionville and Thornhill, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address and a survey, if you have one; what you want to add and where; and photos of the side of the house and the yard where it would go. Send those and we tell you what the City of Markham Building Standards Department will ask for before we quote.
It can. A rear addition’s foundation is dug into the yard, and Tree Preservation By-law 2023-164 requires a permit before a private tree 20 cm or more across at 1.37 m above ground is injured, even one in poor shape, while City trees are covered too. We plot the trees from your survey before the footprint is fixed, so the addition can step around a protected tree, or the tree permit goes in before the Building Standards Department reviews the set.
It can if the lot has a detached, semi-detached or townhouse dwelling and is outside a GWY1 zone and TRCA hazard lands, which is where Section 4.9.9 of By-law 2024-19 allows additional units. An addition is part of the house, so a unit in it counts toward the two the house can hold, and it is drawn with the fire separation and exits a second unit needs.
No. Zoning is applicable law under the Building Code, so the Building Standards Department cannot issue the permit until the Committee of Adjustment has granted the variance and the decision is final. We prepare the permit set while the variance is heard, so it is ready to upload to ePLAN once the decision is in.
Usually, unless yours is recent and shows the house as it stands today. The setbacks and coverage under By-law 2024-19 are measured from it, and because an addition on an existing lot goes through Markham’s RIGS grading and servicing review, the existing grades a surveyor records are the starting point for that plan too. If you do not have a recent one, we can arrange it.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationSize, storeys, how much of the existing house is opened and the finishes set it, so a figure given before there is a design means little. Foundation and structure are the fixed part and finishes the variable one, and a minor variance or a new heating system adds its own line. Fine Engineering itemizes the addition after the site visit.
It depends on what the addition adds: a bedroom, a bigger kitchen or a rental unit. The first two let the owner stay on a lot they already own, and a rental unit can also bring in income. Fine Engineering’s Director is a Broker of Record and can say what the new space may be worth at resale before the owner spends.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Stop work and start on the drawings. A stop-work order usually means construction began without a permit or departed from the approved plans. Getting out of it takes a permit application that shows what was built and what is proposed, then whatever inspections the city asks for. Fine Engineering prepares those drawings and replies to the city’s letters.
Good to know
In Markham the reviewer is the City of Markham Building Standards Department. Every Markham lot sets its own terms: setbacks, lot coverage, what the existing foundation can carry and where the roof will join decide the addition before the first drawing.
We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the home additions package to the City of Markham Building Standards Department’s own checklist.
Markham has heritage village cores in Unionville and Markham Village surrounded by 1980s to 2000s subdivisions and newer planned communities like Cornell. In the village cores an addition is designed with the street in view. On a subdivision lot the approved grading plan usually takes in the neighbours too, so a rear addition keeps their drainage as it was, and a second storey has to fit the zone’s height limit.
Markham takes permit applications only through ePLAN, so an addition goes up as electronic sheets: the site plan from the survey, existing and proposed floor plans, elevations, the new foundation and framing, and the heating for the added rooms. The examiner’s comments come back as mark-ups in the portal.
We answer each comment on the sheet it refers to and resubmit in the same portal, and we tell you before any comment changes the design.
A second storey puts a floor on walls and footings built to carry a roof, so before the new rooms are drawn we check the footings and the framing that will take the load. On a house in one of Markham’s 1980s to 2000s subdivisions, the original permit drawings, where you have them, show what was built; otherwise we open the basement at a few points to look.