The floor outside
Decks & railings
Pressure-treated and composite decks with guards that meet the code’s height and load rules.
- Deck framing & spans
- Guard & stair design
- Composite or wood decking
- Lighting rough-in
Decks & Porches · Toronto
Deck builder for Toronto: decks, covered porches and rear canopies drawn to Toronto Building’s deck and porch guide, with footings set below frost, guards to the Building Code and a layout clear of protected trees and setbacks, built by the team that drew them.

What’s included
Outdoor structures fail at the ground and at the house: footings that heave and ledgers that rot. We design both properly, then build what we drew. In Toronto the package goes to Toronto Building, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the footing inspection setting the pace.
We look at the grade, the wall the structure will attach to, the access for materials and how you want to use the space.
Drawings for the permit, with the structure sized in-house, filed with the city and answered at no extra charge.
Locates, footings, framing, decking or roof, guards and stairs, inspected at the footing and framing stages.
Railings, lighting and finishes, the final inspection, and the permit closed.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Not on most lots. Toronto looks at the grades around a deck as part of the building permit, so they go on the drawings we file with Toronto Building. The exception is a lot inside a ravine and natural feature protection area, where Chapter 658 of the Toronto Municipal Code needs a separate permit to change the grade, and Urban Forestry takes those applications.
Where the lot is in a TRCA Regulated Area, yes. TRCA asks for its own permit before anything is built there, a deck included, and that permit has to be in hand before Toronto Building issues the building permit. We run the address through TRCA’s Regulated Area Search when the survey comes in.
Yes. We take on decks & porches across Toronto, including North York and Scarborough, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address; photos of the yard and the wall the structure would attach to; and rough size, and whether you want it covered. Send those and we tell you what Toronto Building will ask for before we quote.
Yes. Each footing is a hole dug among the roots, and Toronto’s Private Tree By-law requires a permit to injure any private tree 30 cm across or wider at 1.4 m above ground, while City street trees are protected at any size, which matters for a front porch near the street. We place the footings from the survey to keep clear of those trees, or use a longer beam so fewer footings land near a trunk, before the drawings go to Toronto Building.
It can, because the porch is part of the house’s street face. Toronto’s Part V heritage conservation districts include Cabbagetown, Harbord Village, Riverdale and Parkdale Main Street, among others, and each carries its own requirements. For a house inside one, we confirm those requirements with the City before we draw the porch’s roof, columns and railings for Toronto Building.
For most lots it is Zoning By-law 569-2013, but some Toronto properties are still governed by the by-law of a former municipality, so the first step is finding out which one covers yours. We look the address up, place the deck against that by-law’s setbacks, and only then size the footings and framing for Toronto Building.
Yes. The footing sizes and beam spans on the set Toronto Building approves are the ones our crew builds to, because the same team does both. We build decks across the city, Etobicoke and East York included, and the inspector finds a deck that matches its drawings.
The permit holder calls for them at the stages the Building Code sets, and when we are building your deck, we make those calls. Toronto Building’s inspectors check the work against the permit, and the permit’s status and inspections can be followed on the City’s Building Permit Application & Inspection Status site. The permit stays open until the last required inspection is done and it is closed, which we see through.
Yes, if it narrows the path, so we draw around it. Toronto requires a firefighting access path to a garden suite from the street the house faces, at least 1.0 m wide with 2.1 m of headroom, and because that rule sits outside Zoning By-law 569-2013, the Committee of Adjustment cannot vary it. A deck, stair or canopy in the side yard is drawn to leave that path clear all the way to the suite’s door.
Searched & answered
Short answers to the decks & porches questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationDecks in Toronto follow the Ontario Building Code, and the city checks every deck that needs a permit against the drawings filed for it. Toronto Building’s deck and porch permit drawings must show footing size, spacing, depth, height above grade and frost protection, column and beam sizes and spans, and guard details covering openings and climbability. Fine Engineering draws each of those from a site measure-up.
Usually, yes. Each municipality sets its own line. The GTA rules we work with go by the deck’s height above the ground, and some also count any deck fastened to the house. A roofed porch fastened to the house needs one under each of them. Cities word the rule differently, so Fine Engineering checks your municipality’s own wording before a deck is drawn.
Start with drawings and, in most cases, a permit, then build from the ground up. Once the permit is issued, call for utility locates, dig the footings to the depth your soil needs and call in each inspection the permit lists as that stage is reached. Then come the framing, the decking, the guards and stairs, and the final inspection. Fine Engineering draws and builds decks across the GTA.
As part of the deck, on the same permit drawings. The stringers are cut to the drawing and fastened to the deck framing, and the guard rule that applies to the deck applies to the open sides of the stair too. Fine Engineering draws the stair, its stringers and its guard on the permit set.
Either the main roof carries down over the porch, or a lower shed roof hangs off the house wall. Both put new roof and snow load on the house, so the join needs flashing and the existing wall and roof framing has to carry it. Fine Engineering checks that framing before the porch roof is drawn.
For a permit, the zoning by-law decides. Zoning is applicable law, so a permit is only issued for work that complies with it. If a covered porch would take the lot past what its by-law allows, the owner makes the porch smaller or gets a minor variance first. Fine Engineering reads the by-law for your lot, including how it treats a roofed porch, before the porch is drawn.
Good to know
In Toronto the reviewer is Toronto Building. Every Toronto lot sets its own terms: the height above grade, the wall the deck fastens to and the soil under the footings decide the design before anything is dug.
We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the decks & porches package to Toronto Building’s own checklist.
Housing in Toronto runs to prewar and postwar houses on narrow lots across the inner suburbs, with most recent growth in mid- and high-rise apartments. On a narrow lot a rear deck can run close to both side lot lines, so the zoning setbacks may fix its width. A deck replaced on a postwar house may predate today’s guard rules, so the new one is drawn to the current code.
In Toronto, building a deck more than 60 cm (24 in) above the ground needs a building permit. Toronto’s permit guidance lists an uncovered deck whose finished level is no more than 60 cm above the adjacent finished grade, and that is not part of an exit required by the Building Code, as work that does not need a permit, though it must still comply with the Zoning By-law.
The same guidance puts enclosing an existing deck, porch or patio of any size on the permit side, and the city’s deck guide adds that some detached decks may not need a permit. A low deck fastened to the house is the case we confirm with Toronto Building before telling you there is nothing to file.
Toronto Building takes deck and porch permit applications online only, through its Express portal. We prepare the set to the checklist in the city’s deck and porch guide, file it there and answer the examiner’s comments until the permit is issued.
The 60 cm height that puts a deck on the permit side in Toronto lines up with the Building Code’s guard rule, which calls for a guard on any open side of a walking surface more than 600 mm above the surface within 1.2 m of it. A deck high enough to need a Toronto permit will usually need guards as well.
For a deck serving a house, or a house with a secondary suite, the guard has to be at least 900 mm high where the deck is no more than 1,800 mm above finished ground, and at least 1,070 mm where it is higher. Our framing sheets show the guard height on each side, with the posts and connections that hold it.
Toronto Building checks a deck’s footings against the Building Code, which ties their depth to the soil: in clay, or soil that has not been clearly identified, a foundation with no heated space goes at least 1.2 m below finished ground and no shallower than the frost line, unless local experience or an engineered design supports less.
A small deck is exempt from those depths if it is one storey or less, no more than 55 m², has its joists within 600 mm of the ground and carries no roof, and is either freestanding or shown not to harm the structure it is attached to. So a low freestanding deck under Toronto’s 60 cm permit line can sit on shallower footings, while a covered porch never qualifies.
Contact us
Send us a few photos of the yard and we’ll tell you what the permit needs, on a free first call.
First consultation free(416) 990-9179