Decks & Porches · Toronto

Decks & Porches in Toronto

Deck builder for Toronto: decks, covered porches and rear canopies drawn to Toronto Building’s deck and porch guide, with footings set below frost, guards to the Building Code and a layout clear of protected trees and setbacks, built by the team that drew them.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Wood deck with cable railings above a treed yard
Recent project
London · 570 sq ft porch
Municipality
Toronto, Ontario
Permit office
Toronto Building
From our office
About 30 minutes
Fig. 01 · Wood deck with cable railings above a treed yardRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

Outdoor structures fail at the ground and at the house: footings that heave and ledgers that rot. We design both properly, then build what we drew. In Toronto the package goes to Toronto Building, and it is drawn to that department’s checklist.

  • Rear deck with a pergola in Barrie

    The floor outside

    Decks & railings

    Pressure-treated and composite decks with guards that meet the code’s height and load rules.

    • Deck framing & spans
    • Guard & stair design
    • Composite or wood decking
    • Lighting rough-in
  • Covered front porch addition in London

    Front and back

    Covered porches

    Roofed porches tied into the house, with posts, beams and footings designed for the roof and its snow load.

    • Roof framing & tie-in
    • Posts & beams
    • Footings below frost
    • Ceiling & finishes
  • Rear canopy added to a house in Strathroy

    Shade without walls

    Rear canopies

    Freestanding or attached canopies over patios and decks, engineered for wind uplift as well as snow.

    • Canopy structure
    • Wind & snow loads
    • Attachment to the house
    • Drainage off the roof
  • Lakeside deck and walkout

    Below the surface

    Footings & structure

    Footings sized for the load and dug below frost, with the ledger flashed and fastened so water stays out of the house.

    • Footing size & depth
    • Ledger & flashing
    • Frost protection
    • Utility locates

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

05 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Site visitMeasured on site
  2. Permit drawingsPlan, elevation, section, footings, guards
  3. Structural designP.Eng stamp where the span needs it
  4. Building permitFiled and followed to issue
  5. Utility locatesBefore anyone digs
  6. ConstructionOur crew, footings to finishes
  7. Inspections & close-outThe permit closed when it’s done

How it runs

Process: 4 steps from first call to sign-off.

Four steps, with the footing inspection setting the pace.

  1. Site visit

    We look at the grade, the wall the structure will attach to, the access for materials and how you want to use the space.

  2. Design & permit

    Drawings for the permit, with the structure sized in-house, filed with the city and answered at no extra charge.

  3. Build

    Locates, footings, framing, decking or roof, guards and stairs, inspected at the footing and framing stages.

  4. Finish & close out

    Railings, lighting and finishes, the final inspection, and the permit closed.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Property address
  • Photos of the yard and the wall the structure would attach to
  • Rough size, and whether you want it covered
  • A survey, if you have one
  • Any city letter about an existing deck

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

  • Halton

  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: decks & porches in Toronto, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • Not on most lots. Toronto looks at the grades around a deck as part of the building permit, so they go on the drawings we file with Toronto Building. The exception is a lot inside a ravine and natural feature protection area, where Chapter 658 of the Toronto Municipal Code needs a separate permit to change the grade, and Urban Forestry takes those applications.

  • Where the lot is in a TRCA Regulated Area, yes. TRCA asks for its own permit before anything is built there, a deck included, and that permit has to be in hand before Toronto Building issues the building permit. We run the address through TRCA’s Regulated Area Search when the survey comes in.

  • Yes. We take on decks & porches across Toronto, including North York and Scarborough, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.

  • Three things to start: property address; photos of the yard and the wall the structure would attach to; and rough size, and whether you want it covered. Send those and we tell you what Toronto Building will ask for before we quote.

  • Yes. Each footing is a hole dug among the roots, and Toronto’s Private Tree By-law requires a permit to injure any private tree 30 cm across or wider at 1.4 m above ground, while City street trees are protected at any size, which matters for a front porch near the street. We place the footings from the survey to keep clear of those trees, or use a longer beam so fewer footings land near a trunk, before the drawings go to Toronto Building.

  • It can, because the porch is part of the house’s street face. Toronto’s Part V heritage conservation districts include Cabbagetown, Harbord Village, Riverdale and Parkdale Main Street, among others, and each carries its own requirements. For a house inside one, we confirm those requirements with the City before we draw the porch’s roof, columns and railings for Toronto Building.

  • For most lots it is Zoning By-law 569-2013, but some Toronto properties are still governed by the by-law of a former municipality, so the first step is finding out which one covers yours. We look the address up, place the deck against that by-law’s setbacks, and only then size the footings and framing for Toronto Building.

  • Yes. The footing sizes and beam spans on the set Toronto Building approves are the ones our crew builds to, because the same team does both. We build decks across the city, Etobicoke and East York included, and the inspector finds a deck that matches its drawings.

  • The permit holder calls for them at the stages the Building Code sets, and when we are building your deck, we make those calls. Toronto Building’s inspectors check the work against the permit, and the permit’s status and inspections can be followed on the City’s Building Permit Application & Inspection Status site. The permit stays open until the last required inspection is done and it is closed, which we see through.

  • Yes, if it narrows the path, so we draw around it. Toronto requires a firefighting access path to a garden suite from the street the house faces, at least 1.0 m wide with 2.1 m of headroom, and because that rule sits outside Zoning By-law 569-2013, the Committee of Adjustment cannot vary it. A deck, stair or canopy in the side yard is drawn to leave that path clear all the way to the suite’s door.

Searched & answered

People Also Ask: what Toronto searches about decks & porches.

Short answers to the decks & porches questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Decks in Toronto follow the Ontario Building Code, and the city checks every deck that needs a permit against the drawings filed for it. Toronto Building’s deck and porch permit drawings must show footing size, spacing, depth, height above grade and frost protection, column and beam sizes and spans, and guard details covering openings and climbability. Fine Engineering draws each of those from a site measure-up.

  • Usually, yes. Each municipality sets its own line. The GTA rules we work with go by the deck’s height above the ground, and some also count any deck fastened to the house. A roofed porch fastened to the house needs one under each of them. Cities word the rule differently, so Fine Engineering checks your municipality’s own wording before a deck is drawn.

  • Start with drawings and, in most cases, a permit, then build from the ground up. Once the permit is issued, call for utility locates, dig the footings to the depth your soil needs and call in each inspection the permit lists as that stage is reached. Then come the framing, the decking, the guards and stairs, and the final inspection. Fine Engineering draws and builds decks across the GTA.

  • As part of the deck, on the same permit drawings. The stringers are cut to the drawing and fastened to the deck framing, and the guard rule that applies to the deck applies to the open sides of the stair too. Fine Engineering draws the stair, its stringers and its guard on the permit set.

  • Either the main roof carries down over the porch, or a lower shed roof hangs off the house wall. Both put new roof and snow load on the house, so the join needs flashing and the existing wall and roof framing has to carry it. Fine Engineering checks that framing before the porch roof is drawn.

  • For a permit, the zoning by-law decides. Zoning is applicable law, so a permit is only issued for work that complies with it. If a covered porch would take the lot past what its by-law allows, the owner makes the porch smaller or gets a minor variance first. Fine Engineering reads the by-law for your lot, including how it treats a roofed porch, before the porch is drawn.

Good to know

Before a Toronto deck is drawn

In Toronto the reviewer is Toronto Building. Every Toronto lot sets its own terms: the height above grade, the wall the deck fastens to and the soil under the footings decide the design before anything is dug.

We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the decks & porches package to Toronto Building’s own checklist.

Deck building across North York and Scarborough

Housing in Toronto runs to prewar and postwar houses on narrow lots across the inner suburbs, with most recent growth in mid- and high-rise apartments. On a narrow lot a rear deck can run close to both side lot lines, so the zoning setbacks may fix its width. A deck replaced on a postwar house may predate today’s guard rules, so the new one is drawn to the current code.

When a Toronto deck needs a building permit

In Toronto, building a deck more than 60 cm (24 in) above the ground needs a building permit. Toronto’s permit guidance lists an uncovered deck whose finished level is no more than 60 cm above the adjacent finished grade, and that is not part of an exit required by the Building Code, as work that does not need a permit, though it must still comply with the Zoning By-law.

The same guidance puts enclosing an existing deck, porch or patio of any size on the permit side, and the city’s deck guide adds that some detached decks may not need a permit. A low deck fastened to the house is the case we confirm with Toronto Building before telling you there is nothing to file.

Filing a deck permit with Toronto Building

Toronto Building takes deck and porch permit applications online only, through its Express portal. We prepare the set to the checklist in the city’s deck and porch guide, file it there and answer the examiner’s comments until the permit is issued.

Guards on a deck that needs a Toronto permit

The 60 cm height that puts a deck on the permit side in Toronto lines up with the Building Code’s guard rule, which calls for a guard on any open side of a walking surface more than 600 mm above the surface within 1.2 m of it. A deck high enough to need a Toronto permit will usually need guards as well.

For a deck serving a house, or a house with a secondary suite, the guard has to be at least 900 mm high where the deck is no more than 1,800 mm above finished ground, and at least 1,070 mm where it is higher. Our framing sheets show the guard height on each side, with the posts and connections that hold it.

Footing depth under a Toronto deck

Toronto Building checks a deck’s footings against the Building Code, which ties their depth to the soil: in clay, or soil that has not been clearly identified, a foundation with no heated space goes at least 1.2 m below finished ground and no shallower than the frost line, unless local experience or an engineered design supports less.

A small deck is exempt from those depths if it is one storey or less, no more than 55 m², has its joists within 600 mm of the ground and carries no roof, and is either freestanding or shown not to harm the structure it is attached to. So a low freestanding deck under Toronto’s 60 cm permit line can sit on shallower footings, while a covered porch never qualifies.

Contact us

Footings deep. Ledger flashed. A deck that stays put.

Send us a few photos of the yard and we’ll tell you what the permit needs, on a free first call.

First consultation free(416) 990-9179