The way in
Separate entrance
A new exterior door cut into the foundation, with the stairwell, guard and drainage designed so the opening does not weaken the wall.
- Foundation opening design
- Stairwell & drainage
- Guards & lighting
- Frost & waterproofing
Legal Basements · Vaughan, York Region
Legal basement apartments for Vaughan houses in Woodbridge, Maple, Kleinburg and Thornhill, designed to the unit rules in By-law 083-2025 and to the Building Code: entrance, fire separations, egress, a second kitchen and HVAC for both units. Fine Engineering prepares the set in Richmond Hill and files it with the City of Vaughan Building Standards Department.

What’s included
A legal unit is a list of code items, and the inspector checks each one. We design to that list, build to it, and book the inspections in the order the city wants them. In Vaughan the package goes to the City of Vaughan Building Standards Department, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
06 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from a bare basement to a closed permit, with the inspections built into the schedule.
We measure the ceiling, look at the windows, the entrance options and the mechanical room, and tell you whether the basement can be made legal and what it will take.
Layout, separations, the structural opening and HVAC are drawn in one office and filed with the municipality. City comments are answered at no extra charge.
Entrance, framing, rough-ins, insulation and rated assemblies go in, inspected at each stage.
Kitchen, bathroom, flooring and doors, then the final inspection and the closed permit.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179A building permit for the unit, applied for with drawings at Vaughan’s own building department rather than York Region. The stairwell for a new entrance changes the grade beside the house, and Vaughan reviews that with the building permit. We prepare and file the set and deal with the examiner’s comments.
Only where the lot is inside Toronto and Region Conservation Authority (TRCA) regulation, near a watercourse, a valley or a floodplain. Digging a stairwell down to the basement changes the grade there, and the TRCA permit may be needed before Vaughan issues the building permit. We check the regulation mapping before the entrance is drawn.
Under By-law 083-2025, which amends Vaughan’s Zoning By-law 001-2021, a lot may have a maximum of two additional residential units: either two within a single detached, semi-detached or townhouse dwelling, or one within the dwelling and one within a detached residential accessory structure. An additional residential unit is only permitted on a lot with municipal water and sanitary services, and other zoning standards also apply. We check the lot’s servicing first, then the basement itself.
Yes. We take on legal basements across Vaughan, including Woodbridge and Maple, about half an hour from our Richmond Hill office. The first consultation is free, by phone or on site.
Three things to start: property address; basement ceiling height, measured floor to joist; and photos of the basement, the mechanical room and the outside wall where an entrance could go. Send those and we tell you what the City of Vaughan Building Standards Department will ask for before we quote.
It can. Digging a stairwell close to the roots can injure a tree, and By-law 177-2025 needs a permit for that once the trunk is 20 cm across, whether the tree is yours, a neighbour’s or the city’s. Parks and Forestry Operations issues that permit, separately from the Building Standards Department’s review of the unit, so we measure nearby trees before choosing which side the entrance goes on.
Being in a district adds a check on the outside of the house. In Kleinburg-Nashville, Maple, Thornhill and Woodbridge, a new side door, an entrance stair or larger basement windows change what the street sees, so we confirm with the City of Vaughan what the district asks of them before they are drawn. The unit inside is designed to By-law 083-2025 and the Building Code like any other Vaughan basement.
Yes. One project on our list is a 1,100 square foot basement unit in a Vaughan house, with its own entrance, fire separations between the two homes and HVAC designed for both, permitted through the City of Vaughan and now rented. A new Vaughan basement starts the same way: a site visit, then drawings to By-law 083-2025 and the Building Code for the Building Standards Department.
Ontario’s rule for added units asks for one space for the unit’s occupant, and a tandem space behind another car counts, unless the zoning by-law requires no parking for the main house or none for the unit. The parking standards for your lot sit in Zoning By-law 001-2021, or in By-law 1-88 where part of the new by-law is under appeal, so we check the driveway against the right one before the set goes to the Building Standards Department.
Yes. Ontario’s regulation lets anyone live in an added unit, owner or tenant, related to the household or not. Under Vaughan’s By-law 083-2025 the basement is one of the lot’s added units whoever lives in it, so the drawings and the Building Standards Department’s inspections are the same either way.
Searched & answered
Short answers to the legal basements questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA legal basement is a basement apartment that meets the Building Code and the local zoning: a self-contained second unit with its own kitchen and bathroom. The code calls it a secondary suite, and Ontario’s planning rules call it an additional residential unit. Fine Engineering designs and permits these units across the GTA and coordinates the build.
At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
For many homeowners, yes. A legal second unit can earn rent and add property value, and because it was built under a permit, it avoids the trouble an unpermitted suite causes when the house is sold. The return depends on how much the basement needs, whether that is more headroom, a new exit or fire separation. Fine Engineering prices that work before any drawing starts.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Good to know
In Vaughan the reviewer is the City of Vaughan Building Standards Department. Every Vaughan lot sets its own terms: the spare capacity in the electrical panel and the size of the water service the two units will share decide how much work a basement unit needs.
We walk the site with the survey, usually within a day or two of the call, before anything is drawn, then file the legal basements package to the City of Vaughan Building Standards Department’s own checklist.
Vaughan’s housing is single-detached homes built mostly from the 1980s onward, with Woodbridge and Thornhill largely built out. Where a subdivision basement already has the height the Building Code sets, the layout decides the job: where the furnace and the main beam sit, and whether the side yard can take a stair down to a new door. On a visit in Kleinburg or Thornhill, we sketch the layout around those two first.
Vaughan takes building permit applications through its Online Permitting Portal at eservices.vaughan.ca, and the drawings go up through the ePlans Portal linked to it. For a basement unit that is one set: floor plans, fire separation and egress details, the HVAC layout for both homes and a site plan showing the entrance.
The portal’s My Permits / Services page then shows where the application stands. When the Building Standards Department sends comments, we revise the drawings and send them back, and we tell you when the permit is issued.
By-law 083-2025 allows the unit but leaves the lot’s other zoning standards in place, and those decide where a new entrance stair can sit. Side and rear setbacks come from Zoning By-law 001-2021, or from By-law 1-88 on land still under appeal, so we read the survey against the one that applies before the stair is placed.
On the built-out streets of Woodbridge and Thornhill, if a side stair will not meet the setbacks, we look at the rear yard instead, or at an exit through the main house with an added escape window, which the 2024 Building Code’s renovation rules accept in a house at least five years old.
Contact us
Send us the ceiling height and a few photos and we’ll tell you whether the basement can be made legal, on a free first call.
First consultation free(416) 990-9179